|
(1) TITLE AND LOCATION (CITYAND STATE)
<br />. (2) YEAR COMP.LETEO
<br />IDAHO FALLS POLICE HEADQUARTERS
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />IDAHO FALLS, ID
<br />2020 I
<br />Est.2022
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Project Manager - ADO, in association with a local architect, was selected to provide conceptual design services for the
<br />new Idaho Falls Police Headquarters. Services for this project include creating a spatial needs assessment, site development,
<br />master planning, and full design services, The new 60,000-SF community -oriented state-of-the-art police complex will be
<br />located at 701 Northgate Mile, in the Northside of Idaho Falls, The facility will include components such as evidence, forensic lab,
<br />firearms range, locker rooms, climate -controlled storage; and SWAT / patrol vehicle garage,
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) YEAR COMRLETIED.
<br />MOBILE PUBLIC SAFETY FACILITY NEEDS ASSESSMENT
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />MOBILE, AL
<br />2018 / 2021 I
<br />N / A
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Project Manager - Architects Design Group is providing the City of Mobile with a spatial needs assessment and master
<br />plan for a new consolidated public safety facility. The new facility will house police administration and operations to support the
<br />department's 474 sworn and 232 civilians. Fire administration with approximately 45 fire department staff will also be included
<br />in the new facility, with possibly a full station,
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) YEAR COMPLETED
<br />TALLAHASSEE POLICE HEADQUARTERS
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />TALLAHASSEE, FL
<br />2019
<br />I Est.2023
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Principal in Charge - ADO, in association with a local architectural firm, is designing the new Tallahassee Police
<br />Headquarters, Our scope includes a review of the spatial needs assessment, site identification and analysis, master planning,
<br />conceptual design renderings, interior design, full design and bidding documents, cost estimates, and construction oversight,
<br />The design focuses on enhancing the surrounding neighborhood to integrate TPD's Community Oriented Policing Philosophy,
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2,),YEAR COMPLETED'
<br />TAMPA POLICE DEPARTMENT SPACE NEEDS STUDY
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />TAMPA, FL
<br />2021
<br />I N / A
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Public Safety Project Manager - ADO, working alongside a local architecture firm, is providing a spatial needs assessment
<br />for the City of Tampa Police Department (TPD). The design team is working with TPD to ensure the design of the new facility will
<br />accommodate the department's 936 sworn officers and support staff as well as identify opportunities to maximize space and
<br />allow for future growth.
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) yIAR COMPLETED
<br />WINDERMERE POLICE & MUNICIPAL FACILITY
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />WINDERMERE, FL
<br />2016
<br />2022
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Project Manager - Architects Design Group provided programming, master planning, and full design services for the new
<br />15,000-SF Windermere Town Facilities, The consolidated building includes space for town administration, police, and public
<br />works, This hardened facility's design incorporates redundant systems, such as emergency power that will permit it to remain
<br />fully functional and ensure continued operational capability. This facility was designed to be community -friendly in keeping with
<br />the town's commitment to the premise of community policing. It also incorporates a community meeting and training / conference
<br />facilities in the non -secure area of the buildings. This project was bid under budget and is currently under construction,
<br />(1) AND LOCATION (CITYAND STATE)
<br />(2) YDAR COMPLETED
<br />IT
<br />VILLAGE OF PALM SPRINGS POLICE & MUNICIPAL COMPLEX
<br />�PROFESSIONALIIRIICII
<br />CONSTRUCTION
<br />VILLAGE OF PALM SPRINGS, FL
<br />2002
<br />2004
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Project Manager - Architects Design Group was selected to provide programming, master planning, interior design, and
<br />design services for the Village of Palm Springs Public Safety and Municipal Facility, which included a village hall, public safety
<br />facility, recreational center, library, and community center, The first phase of the project was to master plan the village facilities
<br />and the public safety project for a timeframe of 25 years to anticipate future growth. The second phase was design services
<br />followed by construction administration.
<br />27
<br />
|