Laserfiche WebLink
E.-RESUMES 0FRYPERSONNEL PROPOSED FOR THIS CONTRACT <br />.(Compl:ete 0ne_Section E for each key,; person, <br />12, NAME <br />13. ROLE IN THIS CONTRACT <br />14. YEARS OF EXPERIENCE <br />MARCEL MORLOTE, RA <br />LOCAL ASSOCIATE ARCHITECT <br />A, TOTAL <br />141 <br />B, WITH CURRENT FIRM <br />42 <br />15, FIRM NAME AND LOCATION (CITYAND STATE) <br />WOLFBERG ALVAREZ & ASSOCIATES / CORAL GABLES, FL <br />16, EDUCATION (DEGREEAND SPECIALIZATION) <br />17, CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />BACHELOR OF ARCHITECTURE, UNIVERSITY OF MIAMI <br />REGISTERED ARCHITECT IN; FL <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING AWARDS, ETC) <br />Mr. Morlote joined Wolfberg Alvarez & Partners in 1979 and brings exceptional depth to his work. His skills as an architect, planner, <br />and manager are accompanied by a strong background in engineering, giving him added expertise in the technical requirements <br />for buildings and infrastructure, Marcel directs the day-to-day technical operation for the firm and is experienced in architectural <br />design, design/build, architectural coordination, project management, and construction phase services. His experience includes a <br />variety of projects including mixed -use projects for public sector clients in South Florida and the Caribbean, including Mary Brickell <br />Village, Shops at Sunset Place and NASA's Operations and Support Building II at Kennedy Space Center, Additionally, Mr, Morlote <br />received a Bachelor of Architecture degree from the University of Miami, <br />(1) TITLE AND LOCATION (CITYANDSTATE) (2);YEAR COMPLETED- <br />DORAL POLICE SUBSTATION PROFESSIONAL SERVICES I CONSTRUCTION <br />CORAL, FL 2016 12018 <br />' (3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Principal in Charge -The WA team oversaw the preparation of the design criteria package and project design for a 10,000 <br />SF police substation and master plan for 225 on -grade parking spaces and a separate 10,000-SF civic -use building with a public <br />park. The total size of this project scope was 215,000 SE <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAfl COMPLETED <br />OORAL POLICE HEADQUARTERS <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />DORAL, FL <br />2016 <br />2017 <br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Principal in Charge -This project consists of a 40,000-SF, two-story building to house the primary activities of the city's <br />police department, Additionally, the facility obtained LEED Gold Certification. <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />`Q) YEAR COMPLETED <br />HIALEAH 1OSE F. CARAGOL 1R. EOC <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />HIALEAH, FL <br />2015 <br />I 2016 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Principal in Charge - Wolfberg Alvarez & Partners renovated the City of Hialeah's existing 911 back-up center into the city's <br />new emergency operations center, <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAR COMPLETED <br />POLICE DEPARTMENT AT LIGHTSPEED BUILDING <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />MIAMI, FL <br />2020 <br />I 2020 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Principal in Charge - The WA team was contracted to renovate portions of an existing building to be used by the Miami - <br />Dade Police Department and the City of Miami Beach,.The Police Department space houses GQ-EOC, RTCC, administrative offices, <br />and training centers for PCO and dispatch, <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAR COMPLETED <br />_ <br />MIRAMAR POLICE HEADQUARTERS <br />PRO FESSIONAL SERVICES <br />CONSTRUCTION <br />MIRAMAR, FL <br />2014 <br />2016 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Principal in Charge - New 77,000-SF facility has a Mediterranean design that compliments the architecture of the town <br />center and replaced the decades -old facility rendered useless by Hurricane Wilma. <br />28 <br />