Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED MINIS CONTRACT <br />(Compl'.ete one: Section E for each key,: persona <br />12, NAME <br />13. ROLE IN THIS CONTRACT <br />14. YEARS OF EXPERIENCE <br />RAUL ESTEVEZ <br />MEP PROJECT MANAGER <br />A. TOTAL <br />B, WITH CURRENT FIRM <br />41 <br />37 <br />15, FIRM NAME AND LOCATION (CITYAND STATE) <br />WOLFBERG ALVAREZ & ASSOCIATES / CORAL GABLES, FL <br />16, EDUCATION (DEGREEAND SPECIALIZATION) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />COURSE WORK RELATED TO MECHANICAL ENGINEERING, VALUE <br />ENGINEERING, CONSTRUCTION MANAGEMENT, AND HVAC <br />ENGINEERING <br />18, OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING AWARDS, ETC) <br />With more than 40 years of experience, Mr, Estevez serves as a senior project manager and/or engineering coordinator for the <br />programming, planning, design and construction of some of the firm's largest projects, Mr, Estevez has managed various large-scale <br />and complex projects such as the North Terminal Development at the Miami International Airport as well as other American Airlines <br />projects and the $100 million VA Medical Center in West Palm Beach, FL, Through his work with public safety, aviation, transportation, <br />and development clients, Raul has acquired a broad understanding of project management and has overseen some of the firm's <br />most complex projects, most of which have involved multiple decision -makers and multiple design firms, <br />(1) TITLE AND LOCATION (CITYAND STATE) :(2) YEAH COMPLETED <br />DORAL POLICE DEPARTMENT SUBSTATION PROFESSIONAL SERVICES CONSTRUCTION <br />DORAL, FL 2016 2018 <br />I <br />' (3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Quality Control / Engineering Coordinator - The WA team oversaw the preparation of the design criteria package and <br />project design fora 10,000 SF police substation and master plan for 225 on -grade parking spaces and a separate 10,000-SF civic - <br />use building with a public park. The total size of this project scope was 215,000 SF <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />'(2) YEAH COMPLETED. <br />DORAL POLICE HEADQUARTERS <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />DORAL, FL <br />2016 <br />2017 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Quality Control / Engineering Coordinator -This project consists of a 40,000-SF, two-story building to house the primary <br />activities of the city's police department, Additionally, the facility obtained LEED Gold Certification, <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAR COMPLETED <br />MIRAMAR POLICE HEADQUARTERS <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />MIRAMAR, FL <br />2014 <br />I 2016 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Quality Control / Engineering Coordinator - New 77,000-SF facility has a Mediterranean design that compliments the <br />architecture of the town center and replaced the decades -old facility rendered useless by Hurricane Wilma. <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAR COMPLETED <br />MIAMI LAKES GOVERNMENT CENTER <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />MIAMI LAKES, FL <br />2011 <br />I 2013 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Quality Control / Engineering Coordinator - The WA team designed the 25,000-SF government center to house executive <br />and administrative offices, council chamber, public safety department, and ancillary functions as well as a parking lot for 100 <br />parking spaces, <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2) YEAR COryIP4 ETCp <br />WASD SOUTH MIAMI HEIGHTS MAINTENANCE FACILITY <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />SOUTH MIAMI, FL <br />2009 <br />I 2010 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Quality Control / Engineering Coordinator - WA provided program verification, master planning, architecture, mechanical <br />and electrical engineering design services for a new 126,000-SF maintenance facility, <br />29 <br />