|
E. RESUMES OF KEY PERSONNEL PROPOSED MINIS CONTRACT
<br />(Compl'.ete one: Section E for each key,: persona
<br />12, NAME
<br />13. ROLE IN THIS CONTRACT
<br />14. YEARS OF EXPERIENCE
<br />RAUL ESTEVEZ
<br />MEP PROJECT MANAGER
<br />A. TOTAL
<br />B, WITH CURRENT FIRM
<br />41
<br />37
<br />15, FIRM NAME AND LOCATION (CITYAND STATE)
<br />WOLFBERG ALVAREZ & ASSOCIATES / CORAL GABLES, FL
<br />16, EDUCATION (DEGREEAND SPECIALIZATION)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE)
<br />COURSE WORK RELATED TO MECHANICAL ENGINEERING, VALUE
<br />ENGINEERING, CONSTRUCTION MANAGEMENT, AND HVAC
<br />ENGINEERING
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING AWARDS, ETC)
<br />With more than 40 years of experience, Mr, Estevez serves as a senior project manager and/or engineering coordinator for the
<br />programming, planning, design and construction of some of the firm's largest projects, Mr, Estevez has managed various large-scale
<br />and complex projects such as the North Terminal Development at the Miami International Airport as well as other American Airlines
<br />projects and the $100 million VA Medical Center in West Palm Beach, FL, Through his work with public safety, aviation, transportation,
<br />and development clients, Raul has acquired a broad understanding of project management and has overseen some of the firm's
<br />most complex projects, most of which have involved multiple decision -makers and multiple design firms,
<br />(1) TITLE AND LOCATION (CITYAND STATE) :(2) YEAH COMPLETED
<br />DORAL POLICE DEPARTMENT SUBSTATION PROFESSIONAL SERVICES CONSTRUCTION
<br />DORAL, FL 2016 2018
<br />I
<br />' (3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Quality Control / Engineering Coordinator - The WA team oversaw the preparation of the design criteria package and
<br />project design fora 10,000 SF police substation and master plan for 225 on -grade parking spaces and a separate 10,000-SF civic -
<br />use building with a public park. The total size of this project scope was 215,000 SF
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />'(2) YEAH COMPLETED.
<br />DORAL POLICE HEADQUARTERS
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />DORAL, FL
<br />2016
<br />2017
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Quality Control / Engineering Coordinator -This project consists of a 40,000-SF, two-story building to house the primary
<br />activities of the city's police department, Additionally, the facility obtained LEED Gold Certification,
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) YEAR COMPLETED
<br />MIRAMAR POLICE HEADQUARTERS
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />MIRAMAR, FL
<br />2014
<br />I 2016
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Quality Control / Engineering Coordinator - New 77,000-SF facility has a Mediterranean design that compliments the
<br />architecture of the town center and replaced the decades -old facility rendered useless by Hurricane Wilma.
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) YEAR COMPLETED
<br />MIAMI LAKES GOVERNMENT CENTER
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />MIAMI LAKES, FL
<br />2011
<br />I 2013
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Quality Control / Engineering Coordinator - The WA team designed the 25,000-SF government center to house executive
<br />and administrative offices, council chamber, public safety department, and ancillary functions as well as a parking lot for 100
<br />parking spaces,
<br />(1) TITLE AND LOCATION (CITYAND STATE)
<br />(2) YEAR COryIP4 ETCp
<br />WASD SOUTH MIAMI HEIGHTS MAINTENANCE FACILITY
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION
<br />SOUTH MIAMI, FL
<br />2009
<br />I 2010
<br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE; Quality Control / Engineering Coordinator - WA provided program verification, master planning, architecture, mechanical
<br />and electrical engineering design services for a new 126,000-SF maintenance facility,
<br />29
<br />
|