My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3313
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2022 9:22:21 AM
Creation date
4/18/2022 11:21:07 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3313
Date (mm/dd/yyyy)
04/12/2022
Description
2nd Amendment w/ Jorda Enterprises, Inc. for inspection & preventative maintenance services for HVAC equipment at Government Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUMP INSPECTIONS <br />Scope of work for routine Inspections on pumps: <br />Lubricate ptrrtrp be$tfngs as per manufactwYers reyommendallons <br />Lubricate motor bearings as per manufacturers recommendations <br />Check packings or.ntechanical seats and adjust as necessbry <br />Check pump starters or VFO's //Assure electrical connections are. secure <br />Check for -abnormal vibrations or nolse <br />Report system deliclenoies with recommendeli improvements <br />Check alternating run hours for pumps. Weekly run Gme should be about equal to prevent <br />unbalanced use on one pump. Check program <br />Lubricate pump bearings per manufacturers recommondations <br />Lubricate motor bearings per manufaclurers recornrnondaticns <br />Check motor mounts and vibration pads <br />Check motor mounts and vibration pads <br />Meg Motor and chedt connections secure <br />Operate pumps and check efficiency <br />Check for abnormal vibrations or nofse <br />Report system defidendes with recommended improvements <br />IMCOOL•INO Tong INSPECTIONS <br />Scope of work for routine inspections, on cooling towers: <br />A Visually Inspect fare assembly <br />0 Gear driven cooling tower fans: Check oil level in gearedW,&,.add oil as required <br />C Belt driven coollpg tower fans: t:hepk bbit tenblon. ddjust as necessay <br />4 Chedk Intake strainers, make up'water ftobt assemblies, and overflows <br />E Check motor VFD's7Wapplicable <br />F Report system ds with recommended improvements <br />scope of work for annual inspections on cooling't,owers: <br />A Cherk tower spray poa1e9 and eliminators as required <br />J3 Clean Cooling tower once yearly and check for leaks 1 Includes Scaffolding <br />C Lubricate -fan and motor bearings per manufacturer recommendations <br />0 Check vollapes and-amperagas on motors, inspect and tighten all connections <br />Dissasemble, flush and clean filtration system <br />E Rapid syst m del(clendtes vAjh teooinmendedbpmvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.