Laserfiche WebLink
AIR HANDLING UNITS <br />Scope of work for routine Inspections on Air Handlers <br />8 Furnish and Replace AU Filters with 2 Inch INck MERV 8 pleataed fillers <br />C Check and Purge drain Fines as necessary <br />Q Check Bali Tension! Replace as necessaryat prelered custauell"rices <br />'E Lubricate bearings and moving parts, motors; bipaers. <br />'F Check VFbs for properopenWan <br />Scope of Work for Annual Inspeetiona on Air Hpndlers <br />A Reeerd pertinent system temperatures, pressures, and electrical readings nacedsery to determine <br />the existing operating conditl me of tho system <br />B Shut down anal Lock out ITog out of ANU <br />C Panel removal foroomponent eocess' <br />(5) PIPES A VALVES <br />Stdke and exen5se all valves once every six months. To be done by banding maintenance <br />Touch up paint on all pipes ds needed to avoid premature detemoration and to mah"n gaaIW <br />appearance. This also includes pipe supports and springs..To be ddne by building maintenance <br />0 <br />a <br />a <br />