My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFRASTRUCTURE GROUP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Responses
>
INFRASTRUCTURE GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:46:27 PM
Creation date
5/31/2022 3:46:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Infrastructure Solutions Group – 3002 S. Ruby Ave., Gonzales, LA 70737 – estimating@isg.work <br /> <br /> <br />b. Third party testing. <br />c. Additional ground rods to meet resistivity requirements. <br />d. Equipment preservation. <br />e. Climate controlled storage facilities <br />f. Area of classifications. <br />g. Structural steel supports <br />h. Insulation, grouting, coating, painting, welding and/or cutting <br />i. Fireproofing removal and/or repair <br />j. Scaffolding <br />k. Matting <br />l. Bulk-head penetration plate(s) for buildings <br />m. Site temporary power, lighting or other utilities (ISG has included temporary <br />power for our work) <br />n. Trash dumpsters <br />o. Sanitary facilities (portable toilets, hand wash stations, etc.) <br />p. Lunch/break areas <br />q. Man lifts and/or man baskets <br />r. Steel supports, including welding, cutting and fitting <br /> <br />Unit Rate Section (Add these to either commercial or technical) <br /> <br />1. The unit rates cost are based on comments we have added to the pricing sheet rate <br />schedule. <br /> <br />2. The unit price schedule is included in our proposal; however, should the: <br /> <br />a. base man-hours increase more than ten (10%) percent <br />b. project duration is extended <br />c. Additional overtime is incurred due to schedule compression or additional scope <br /> <br />ISG reserves the right to renegotiate pricing to include increases associated with Time <br />Driven Overhead costs (Staffing, Equipment, and Facilities) and premium time adders. <br /> <br />3. ISG’s proposal is based on quantities being mutually agreed to by all parties based on <br />AFC drawings. If quantities cannot be mutually agreed upon and the contract is <br />administered as a purely unit rate contract, cost associated with the supply of additional <br />staff (i.e., quantity surveyors, clerks, field engineer, etc.) will be reimbursed to ISG. <br /> <br />4. Unit Rates are applicable to bulk installations consistent with new construction. Rates are <br />not applicable for work associated with the following: <br /> <br />a. Rework on vendor furnished equipment <br />b. Completion of vendor furnished equipment
The URL can be used to link to this page
Your browser does not support the video tag.