My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFRASTRUCTURE GROUP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Responses
>
INFRASTRUCTURE GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:46:27 PM
Creation date
5/31/2022 3:46:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Infrastructure Solutions Group – 3002 S. Ruby Ave., Gonzales, LA 70737 – estimating@isg.work <br /> <br /> <br />• Safety glasses <br />• Gloves <br />• Hearing protection <br />• Steel toe boots <br />• Harness with lanyard <br /> <br />6. Any breakdown of the billing rates are for bid evaluation purposes only. The rate <br />buildups are not auditable. <br /> <br />7. The above rates remain valid through 12/31/2022. <br /> <br /> <br />LONG LEAD TIME ITEMS: <br />1. Quazite Boxes are currently at 14 weeks lead time. <br />2. Fiber is currently at 52-58 week lead time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.