Laserfiche WebLink
<br /> <br /> Infrastructure Solutions Group – 3002 S. Ruby Ave., Gonzales, LA 70737 – estimating@isg.work <br /> <br /> <br />• Safety glasses <br />• Gloves <br />• Hearing protection <br />• Steel toe boots <br />• Harness with lanyard <br /> <br />6. Any breakdown of the billing rates are for bid evaluation purposes only. The rate <br />buildups are not auditable. <br /> <br />7. The above rates remain valid through 12/31/2022. <br /> <br /> <br />LONG LEAD TIME ITEMS: <br />1. Quazite Boxes are currently at 14 weeks lead time. <br />2. Fiber is currently at 52-58 week lead time. <br />