Contractor: JG Group of LA, LLC. Dba Infrastructure Solutions Group <br />Contact Name/Position: David Heroman / LV Manager <br />Email:dheroman@isg.work <br />Phone: 225-892-2891 <br />BB, Lateral, PON (This is for HLD estimates, this does not matter for LLD): BB Mileage - Total Passings <br />Total Design Footage/Miles: 4,212.00 0.80 - Residential <br />Buried: 4,212.00 0.80 - Business <br />Aerial: - - - Anchor <br />Region for unit pricing SouthEast 5%Underground overbuild percentage (If using centerline for PON assume 75%) <br />Use MST's? (Only changes PON estimates) No MST 0%Rock Percentage <br />Urban or Rural (Urban increases labor by 75%) Rural Normal Wage Prevailing Wage Requirement? (adds 30% to labor) <br />Description <br />IMPORTANT: <br />Consultant's Estimated <br />Quantity. Interested <br />Firms: It is your <br />responsibility to review <br />these estimated <br />quantities and revise if <br />needed, based on your <br />professional knowledge <br />of the industry <br />Unit Unit Price Total <br />NOTES: <br />IF YOUR FIRM'S QTY IS DIFFERENT THAN THE <br />CONSULTANT'S ESTIMATED QTY IN <br />"COLUMN C" INSERT YOUR BRIEF <br />DESCRIPTION AS TO WHY YOU HAVE <br />REVISED QTY. <br />UNDERGROUND - BURIED <br />Directional Bore (1) 1"-LF -$ <br />Directional Bore (2) 1"-LF -$ <br />Directional Bore (1) 2"682 LF $ 18.25 12,447.56$ Original Qty:682 <br />We calculated 329' of this from the drawing, but used supplied number. <br />Directional Bore (1) 2" and (1) 1"-LF -$ <br />Directional Bore (1) 2" and (2) 1"-LF -$ <br />Directional Bore (2) 2"5 LF $ 18.25 91.26$ Original Qty: 5 <br />Directional Bore (2) 2" and (1) 1"-LF -$ <br />Directional Bore (3) 2"-LF -$ <br />Directional Bore (3) 2" and (1) 1"-LF -$ <br />Directional Bore (3) 2" and (2) 1"-LF -$ <br />Directional Bore (4) 2"-LF -$ <br />Directional Bore (1) 4"-LF -$ <br />Directional Bore (1) 1 1/4"3,742 LF $ 18.25 68,297.32$ Original Qty:3742 <br />We calculated 3,570' of this from the drawing, but used supplied number. <br />Directional Bore (2) 1 1/4"-LF -$ <br />Directional Bore (3) 1 1/4"-LF -$ <br />Directional Bore (4) 1 1/4"-LF -$ <br />Microtrenching (Narrow Band Trenching) upto 12" deep -LF -$ <br />Microtrenching (Narrow Band Trenching) upto 18" deep -LF -$ <br />Microtrenching (Narrow Band Trenching) upto 24" deep -LF -$ <br />Vibratory Plow 4' deep (1) 2"-LF -$ <br />Vibratory Plow 4' deep (2) 2"-LF -$ <br />Open Cut & Trench (1) 2" at 30" Minimum Depth of Cover -LF -$ <br />Open Cut & Trench (2) 2" at 30" Minimum Depth of Cover -LF -$ <br />Open Cut & Trench (3) 2" at 30" Minimum Depth of Cover -LF -$ <br />Open Cut & Trench (4) 2" at 30" Minimum Depth of Cover -LF -$ <br />Sleeve existing 4" conduit (3) 1 1/4"-LF -$ <br />Pull (4) 2" sdr 11 conduits in 8" casing -FT -$ <br />Bore 6” Casing (Steel)-LF -$ <br />Bore 6” Casing (PVC)-LF -$ <br />Bore 8” Casing (Steel)-LF -$ <br />Bore 8” Casing (PVC)-LF -$ <br />Deep Bore - Water Crossing -LF -$ <br />Install Muletape in New Conduit 30,095 FT -$ Original Qty: 26493.6 <br />This is included with pipe calculations. <br />Bore Rock Adder -LF -$ <br />Trench Rock Adder -LF -$ <br />Install #12 AWG Insulated Tracer Wire 26,494 LF $ 0.11 2,799.56$ Original Qty: 26493.6 <br />We calculated 25,214' of this from drawing, but used supplied number. <br />Install 5/8"x8' Copper Clad Ground Rod 29 EA $ 327.57 9,499.54$ Original Qty: 18 <br />We calculated 29 of these from the drawing. <br />Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top -EA -$ <br />Install 3.5" Dia PVC Round Marker Posts with Orange Dome Top with Test Station -EA -$ <br />Install RFID Ball/Peg Markers -EA -$ <br />Install RFID Rope -LF -$ <br />Proof Existing Conduit - any size -LF -$ <br />Rod Existing Conduit and Install Pull Tape 21,020 LF $ 0.35 7,396.75$ Original Qty: 21020 <br />Remove existing cable - i.e. coax/twisted pair in street light conduits to replace <br />with fiber -LF -$ <br />Installation, Underground Fiber Cable - Including Slack (2ct Fiber)-LF -$ <br />Installation, Underground Fiber Cable - Including Slack (All other fiber)33,294 LF $ 2.11 70,362.12$ Original Qty: 33294 <br />Installation, MST in Pedestal -EA -$ <br />Installation, Pedestal -EA -$ <br />Installation, Drop Vault, 12" X 12"-EA -$ <br />Installation, Small Vault, 17” x 30” (Now 24" x 36" x 18")18 EA $ 634.01 11,412.13$ Original Qty: 18 <br />Installation, Vault 24" x 36"-EA -$ <br />Installation, Large Vault 30" x 48" (Now 30" x 60" x 30")15 EA $ 1,585.02 23,775.27$ Original Qty: 1 <br />We calculated 15 from the drawings) <br />Installation, Extra Large Vault 48" x 60"-EA -$ <br />Install 4'x4'x4' Split Concrete Manhole -EA -$ <br />Remove and Replace Handhole - including fixing sweeps into HH 17 EA $ 1,076.39 18,298.55$ Original Qty: 17 <br />Prep and Pour Concrete Pad for POP Site -EA -$ <br />Sawcut, Remove and Replace Asphalt 6" Thick 17 SqrFt $ 191.61 3,257.30$ Original Qty: 17 <br />Sawcut, Remove and Replace Concrete 6" Thick 272 SqrFt $ 191.61 52,116.78$ Original Qty: 272 <br />Remove and Replace Brick Pavers -SqrFt -$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />UNDERGROUND - BURIED LABOR TOTAL $ 279,754.16 <br />AERIAL -STRAND/LASH <br />Lash/Mount Closure -EA -$ <br />Bond Strand/Guy to pole ground + materials EA -$ <br />Install Strand -FT -$ <br />Install Snow Shoes -EA -$ <br />Install Aerial Slack -EA -$ <br />Install / Lash Aerial Cable -FT -$ <br />Tree Trimming -FT -$ <br />Install Pole Risers -EA -$ <br />Install Down Guy & Anchors -EA -$ <br />Pole Transfer / Make Ready (Straight Through)-EA -$ <br />Pole Transfer / Make Ready (Dead-end)-EA -$ <br />Pole Transfer / Make Ready (Double Dead-end)-EA -$ <br />--$ <br />--$ <br />--$ <br />RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT <br />I. Firms must use the Price Sheet below to submit firms price for this Project. <br />II. Firms shall hold the unit Bid Prices firm throughout the Contract period. Bidder guarantees response time necessary to have a crew return to correct unfinished or unsatisfactory services. <br />III. The City reserves the right to increase, decrease, and/or choose the items and quantities below for the Project to meet its available budget using the unit prices provided below. <br />IIII. The not-to-exceed costs must be inclusive of all related expenses including contract administration, technical assistance to the City, travel, and associated actions necessary for the Project by the Consultant as