My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Unitec Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Responses
>
Unitec Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:48:49 PM
Creation date
5/31/2022 3:46:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIGUEL FERNANDEZ <br />17600 SW 89th Ct, Palmetto Bay, FL 331571305-812-1229 1 mfernandez@unitecus.com <br />Profile <br />7 years' experience in heavy civil construction project management, cost estimating, scheduling, <br />quality control, contract compliance, FDOT and City compliance, maintenance of traffic, coordination <br />of subcontractors, suppliers and field personnel. Ability to communicate in English and Spanish with <br />owners, subcontractors, personnel and government agencies regarding project issues. <br />Education <br />UNIVERSITY OF FLORIDA, GAINESVILLE, FL <br />Bachelor of Science, Civil Engineering, GPA 3.08/4.0 <br />Experience <br />PROJECT MANAGER I UNITEC INC. I APRIL 2020 -CURRENT <br />• City of Miramar (Improvements to the Intersection of Miramar Parkway and Ivy Way) - <br />Installation of concrete Type D -Curb, traffic separator, ADA mats - Miramar, Florida 2021 <br />• City of South Miami (Construction of New Pedestrian Pathway at Fuchs Park) - Installation of <br />gravity wall, asphalt walking path, and shelter - South Miami, Florida - 2021 <br />• City of South Miami (SW 64th ST from 62nd AVE to SW 57th AVE) - Installation of Bicycle Lanes <br />with Separation from Travel Lanes - South Miami, Florida - 2020 <br />• City of Miramar - 2"HDPE conduit installation along Miramar Parkway from Tarpon Drive to <br />Arcadia Drive and from SW 64 Ave to S.R. 7 - Miramar, Florida - 2020 <br />• FDOTMiami Dade - Maintenance contract to repair existing asphalt pavement on various sections <br />of State Roads in North Miami- Dade County - 2020 and 2021 <br />PROJECT MANAGER I ENGECON CONSTRUCTION, INC. I JANUARY 2014 -MARCH 2020 <br />• Airport Access Road Improvements, Phase 1-3 - Road and Bridge Construction, Drainage, <br />Sidewalk, Signalization, Lighting - Vero Beach, Florida - 2018 <br />• NW California Blvd & NW University Blvd. Intersection Improvements - Road Construction, <br />Roundabout, Sidewalk - Port St. Lucie, Florida - 2017 <br />• Tamarind Ave. Beautification (Palm Beach Lakes Blvd, to 25th St.)- Milling and Resurfacing, <br />Sidewalk - West Palm Beach, Florida - 2016 <br />• Savona Blvd. Sidewalk and Bridge (Gatlin Blvd. to Becker Road) - Sidewalk, Drainage, <br />Pedestrian Bridge - Port St. Lucie, Florida - 2015 <br />• T5500 (SR5 From Valkaria Road to 1St St)- Milling and Resurfacing, Turn Lane Construction, <br />Drainage - FDOT, Brevard County, Florida - 2015 <br />GT- <br />
The URL can be used to link to this page
Your browser does not support the video tag.