Laserfiche WebLink
EXHIBIT f12" <br />BASIS OF COMPENSATION SCHEDULE <br />SECTION 4: BASIS OF COMPENSATION <br />No. <br />Task Description <br />Cost per <br />task30°/a <br />Submittal Schedule <br />60% <br />90% <br />100% <br />a/c <br />L <br />Surveying <br />106,965.0 <br />90,425.0 <br />15,000.0 <br />1,540.0 <br />24.1 <br />2 <br />Underground UtilityLocation <br />13 800.0 <br />13,800.0 <br />3.1 <br />3 <br />Vaccum Excavation <br />24,750.0 <br />21,750.0 <br />3,000.0 <br />5.6 <br />4 <br />Drainage Analysis/System Design <br />160,000.0 <br />40 000.0 <br />60,000.0 <br />40,000.0 <br />20,000.0 <br />36.0 <br />5 <br />Pump Station Design <br />65 000.0 <br />15,000.0 <br />25 000.0 <br />20 000.0 <br />51000.0 <br />14.6 <br />6 <br />Cost Estimate <br />7,500.0 <br />3,500.0 <br />4,000.0 <br />1.7 <br />7 <br />Permiting <br />15,000.0 <br />7,500.0 <br />7,500.0 <br />3.4 <br />8 <br />Contract Documents/Bidding <br />14,940.0 <br />7,000.0 <br />7,940.0 <br />3.4 <br />9 <br />Subconsultant Geotechnical <br />9,410.0 <br />9,410.0 <br />2.1 <br />10 <br />Subconsultant Electrical <br />26,500.0 <br />11 925.0 <br />11 925.0 <br />2,650.0 <br />6.0 <br />11 <br />L2 <br />1 TOTAL COST <br />443,865.0 <br />13 <br />Estimated Cost per Submittal <br />168,635.0 <br />141,175.0 <br />94,465.0 <br />1 39,590.0 <br />14 <br />Estimated Percentage of Work <br />i 38.0 <br />1 31.8 <br />21.3 <br />1 8.9 <br />100.0 <br />335 <br />