My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3330
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:43:08 AM
Creation date
6/3/2022 9:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3330
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Calvin, Giordano & Assoc., Inc. to provide revisions, permitting, & post design svcs for Golden Shores Pump Station Rehabiliation Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provide 100% construction documents and technical <br />specifications to CITY. <br />4. Permitting Assistance <br />Contractor is responsible for obtaining the Building Department <br />permit. CGA will submit for a dry -run review. <br />Responses and revisions to construction documents due to <br />Building Department comments are included. <br />5. Bidding Services <br />Review and respond to Bidder questions as they pertain to the <br />plans or technical specifications. This shall include issuing <br />revised plans and/or technical specifications, if required. <br />6. Construction Administration <br />• Provide four (4) field visits during construction. <br />• Provide responses to RFI's during construction. RFI with value <br />engineering questions are not included as part of the scope of <br />work. <br />• Provide review to shop drawings. A maximum of three (3) sets <br />of reviews is included. Reviews includes the generator, electrical <br />components, panels. pump motor demands, and lighting. <br />• Conduct one (1) Substantial Completion inspection / <br />walkthrough; prepare and distribute the punch list. Contractor <br />shall provide as -built drawings for review prior to inspection. <br />• Conduct one (1) Final Completion inspection / walk- through, <br />and one (1) re -inspection. <br />7. Items not included <br />358 <br />
The URL can be used to link to this page
Your browser does not support the video tag.