My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3330
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:43:08 AM
Creation date
6/3/2022 9:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3330
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Calvin, Giordano & Assoc., Inc. to provide revisions, permitting, & post design svcs for Golden Shores Pump Station Rehabiliation Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Receive and assist in the interpretations and clarifications of the <br />Contract Documents, and evaluate requested deviations from the <br />approved design or specifications. In connection therewith, review, <br />prepare and process any work change directives or change orders <br />requested by the Contractor, or the City. <br />5. Attend meetings with City, Contractor and appropriate regulatory <br />agencies when requested by the City, and necessary for consultation or <br />conferences in regard to construction of the project. <br />6. Make daily inspections for compliance with plans and specifications <br />(estimated at 3 hours per day / or 15 hours per week for twenty (20) <br />weeks, and six (6) hours per week for two (2) weeks); make interim <br />inspections for substantial completion and perform a final inspection to <br />determine, in general, if the work has been completed in conformance <br />with the intent of the Contract Documents. Attend and witness <br />required testing (i.e. pressure testing of F.M., P.S. start-up, utility <br />trench backfill density testing, etc.). <br />7. Coordinate, review, and approve Contractor's construction schedule <br />(s), Schedule of Values (SOV) and pay requests. <br />8. Review as-builts provided by the Contractor. <br />9. Assist EOR with Contractor supplied close-out documentation, and <br />permit certification processing. <br />COST OF THESE SERVICES (Lump Sum) <br />Professional Engineering Services <br />A Professional Civil Engineering Services $80 <br />B Professional Electrical Engineering Services $13,615.00 <br />II Professional Surveying Services <br />III Professional Construction Services <br />$1,290.001 <br />$50,297. <br />IV Meetings not included in I thru III Hour] <br />TOTAL (Plus Hourly Services) $145,402.! <br />360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.