My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3332
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2022 1:48:22 PM
Creation date
6/3/2022 9:30:07 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3332
Date (mm/dd/yyyy)
05/19/2022
Description
Agmt w/Perkins+Will Architects, Inc., for Installation of an Emergecy Generator @ Gateway Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIN <br />5. Participate in one (1) meeting with representatives of the city to review the project development of the projects <br />design and the implementation of the agreed upon engineered systems. At the meeting attended by members of <br />the BR+A team we will provide meeting notes for issues related to engineered systems via email for you to include <br />in your meeting notes. We have based our fee upon the following number of meetings one (1) maximum. <br />6. Engineered systems specifications will be provided as part of our engineering services. The specifications shall be <br />on the drawings (no book specs). <br />7. During the Bid / Negotiation Phase we will assist the CM team with: <br />A. Preparation of permitting materials for Agencies Having Jurisdiction (AHJ) reviews. <br />8. During the Construction phase we will: <br />A. Visit the site, up to two (2) meetings maximum including participation in onsite coordination meetings. <br />B. Review shop drawings, product data and samples submitted by the contractors. <br />C. Generate punch lists on an on-going basis ("rolling" punch lists). <br />9. Preparation of record drawings. <br />ELECTRICAL/PLUMBING DESIGN DELIVERABLES <br />1. Construction Documents Phase <br />Electrical / Plumbing Documents submitted for construction. <br />Electrical / Plumbing Specifications suitable for construction. <br />WORK NOT INCLUDED / EXCLUSIONS <br />1. Upgrading of any existing infrastructure systems, other than those mentioned above. <br />2. Preparation of as -built existing condition drawings, the owner shall provide as -built drawings. Field verification and <br />documentation of engineered systems is not included. <br />3. Civil and Site Engineering, site utilities (water, sewer, storm, gas, electric, etc.) to be provided by the Civil Engineer. <br />The above services from the generator to the distribution equipment will be included in our Basic Engineering <br />Services. Relocation of existing utilities in the way of the new generator's footprint are assumed to be done by <br />others. <br />4. Acoustical and vibration analysis is excluded; however, the implementation of that Consultant's recommendations <br />is included. <br />5. Cost Estimating. <br />6. Preparation of more than one bid package. <br />7. Preparation of equipment pre -purchase drawings and specifications. <br />8. Wind Tunnel testing, CFD modeling and / or computational simulation, such as for smoke evacuation, outside air <br />intakes and exhaust locations. However, work associated with interpretation of data and / or assistance to the <br />wind consultant, if a wind consultant is needed for this project, with understanding of the building systems, is <br />included, as well as implementation of the Wind Consultants recommendations. <br />9. Environmental impact statement, engineering, analysis and recommendations for remedial work associated with <br />air intakes, exhaust stacks, etc. (IAQ investigation of Intakes / exhausts, Wind Studies, etc.). <br />10. Any physical testing or the taking of air, water, steam or gas flow readings for the purpose of establishing existing <br />capacities of any existing equipment, infrastructure and / or system. <br />11. Air or water quality analysis, wind dispersion modeling or permitting that might be required for stack and/or waste <br />emissions. We also exclude any tests or design associated with scrubbers, filters or air cleansing equipment <br />associated with any emissions, stacks or flumes associated with any discharge from the project. <br />BR+A CONSULTING ENGINEERS RE: Emergency Generator / April 14, 2022, Page 2 of 4 387 <br />
The URL can be used to link to this page
Your browser does not support the video tag.