or systems, which are the Contractor's responsibility. The Consultant's review shall not <br />constitute approval of safety precautions or, unless otherwise specifically stated by the <br />Consultant, of any construction means, methods, techniques, sequences or procedures. <br />Such action shall be taken with reasonable promptness so as to cause no unreasonable <br />delay. The Consultant's approval of a specific item shall not indicate approval of an <br />assembly of which the item is a component. The review period shall be within two (2) <br />weeks per submission. Field modifications due to design flaws shall not be charged to the <br />City. <br />2.5.5 The Consultant shall obtain permits from all required agencies for the Project. <br />2.5.6 The Consultant shall provide periodic Construction Administration visits to the site to <br />become generally familiar with the progress and the general quality of the Work and to <br />determine in general if the Work is proceeding in accordance with the Contract Documents. <br />On the basis of such on-site observations of the Consultant, the Consultant shall keep the <br />City informed of the progress and the general quality of the Work, and shall endeavor to <br />guard the City against defects and deficiencies observed in the Work of the Contractor. <br />2.5.7 The Consultant shall provide City with five (5) full size copies of plans, including two (2) <br />Permit Sets signed and sealed by Consultant's sub -consultant, specifications, drawings, <br />and other documents. <br />2.5.8 Construction Administration visits shall be a one (1) visit every two (2) weeks, unless <br />modified by City and Consultant, for the duration of the construction/fabrication period <br />and up to six (6) months. Consultant shall include one (1) Punch List review during the <br />Construction Administration phase of Project. <br />2.5.9 The Consultant shall provide construction meetings on site with City's Representative, <br />Consultant & Contractor (OAC Meetings) no later than every four (4) days after reporting. <br />2.5.10 Unless otherwise provided in this Agreement and incorporated in the Contract Documents, <br />the Consultant shall provide administration for the Construction Contract as set forth below <br />and in the Conditions of the Contracts for Construction, as developed by the Contractor <br />with the approval of the Consultant and City. <br />2.5.11 The Consultant shall not have control or charge of and shall not be responsible for <br />construction means, methods, techniques, sequences or procedures, or for safety <br />precautions and programs in connection with the Work, for acts or omissions of the <br />Contractor, subcontractor or any other persons performing any of the Work, or for failure <br />of any of them to carry out the Work in accordance with the Contract Documents. The <br />Consultant shall not be responsible for the Contractor. The Consultant shall at all times <br />have access to the Work wherever it is in preparation or progress. <br />2.5.12 Based on the Consultant's observations at the site, the recommendations of the Contractor <br />and an evaluation of the Application for Payment, the Consultant shall determine the <br />amounts owing to the Contractor and shall issue a Certificate of Payment in such amounts, <br />as provided in the Contract Documents. <br />375 <br />