My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3346
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 12:47:27 PM
Creation date
6/7/2022 12:24:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3346
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Aecom Technical Svcs, Inc. for Professional Consulting Svcs, for development of parks & recreation master plan.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68 City of Miami - RFQ# 501331,2 - Misceilaneous Management Advisory Consulting Services <br />The development ofJurong Lake District is part <br />of the national strategy to decentralize some <br />commercial activities to the regional centres <br />to reduce the need to commute'in and out of . <br />the Central Business District, and to bring jobs <br />closer to where people live. The district is make <br />made up of two precincts: a 70 ha mixed-use <br />commercial hub atJurong Gateway and a 295 ha <br />vibrant world-class and family -friendly leisure <br />and recreation destination at Lakeside. <br />By adopting SSIMTM, AECOM developed <br />strategies to maximize sustainability <br />performance with optimal cost -benefit <br />parameters, and helped URA determine an <br />optimal sustainable development plan for the <br />District, integrating sustainable transportation, <br />building energy savings, water conservation <br />and ecological strategies into the high-density <br />district. <br />iii. Total dollar value of the contract: App ox. $1.2 <br />million <br />iv. Contract duration: 18 Months <br />v. Customer contact person and phone number: <br />Client contact information is not available <br />vi. Prime or subcontractor: Prime. All work was <br />completed on time and within budget. <br />vii. Results of the project: Development of <br />Masterplan and decision support framework <br />tool. Delivered on time and on budget. <br />ZooMiami Entertainment Area (Miami <br />Wilds) <br />i. The client: Miami -Dade County Parks, <br />Recreation and Open Spaces Department <br />ii. Description of work: AECOM was engaged by <br />Miami -Dade County to conduct an independent <br />economic analysis of proposals for the design <br />and operation of a large (approximately <br />241 acres) new destination attraction and <br />resort area near Miami, called the Zoo Miami <br />Entertainment Area (ZMEA), later named Miami <br />Wilds. <br />The destination had a variety of uses including <br />a major news studio -linked (20th Century Fox) <br />theme park, water park, hotel, conference <br />center, themed retail, live performance venue, <br />sports and events fields, and parking. AECOM <br />reviewed several proposals and advised the <br />client of interview questions and comments for <br />proposers. <br />M. Total dollar value of the contract: $108,986.00 <br />iv. Contract duration: August, 2013 —January, 2014 <br />v. Customer contact person and phone number: <br />George Navarrete, Deputy Director, Miami -Dade <br />County Parks, Recreation and Open Spaces <br />Department <br />Telephone: {305) 755-7877 <br />Email: GLN@miamidade.gov <br />vi. Prime or subcontractor: Prime. All work was <br />completed on time and within budget as <br />approved by client. <br />vii. Results of the project: AECOM assessed <br />comparables for each of these uses and <br />examined their potential market penetration, <br />attendance, and other factors to project <br />potential attendance atZMEA. These formed <br />the basis of an analysis of physical planning <br />parameters. The results were used to advise the <br />client on key negotiation points with prospective <br />partners. <br />AECOM also conducted financial analysis of <br />the alternatives, performed a lease and return- <br />on -investment analysis, and participated in <br />negotiations with selected proposers. <br />AECOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.