|
32
<br />LPOC36007.2022 City of Sunny Isles Beach/ Continuing Services for Landscape Architectural Services/RFQ # 22-06-01
<br />SPECIAL QUALIFICATIONS
<br />• Has knowledge of design
<br />that protects and enhances
<br />natural features and habitats,
<br />incorporating them into the
<br />overall design, while respecting
<br />new urbanism design and
<br />development practices
<br />• Presentation graphics,
<br />illustrative renderings, project
<br />photography, 3D modeling
<br />through Sketchup, construction
<br />document preparation, and
<br />LEED document preparation
<br />• Software experience includes
<br />AutoCAD, Photoshop, Sketchup,
<br />LandFx, InDesign, Lumion,
<br />Premiere Pro, Microsoft
<br />Word, Excel, PowerPoint, and
<br />Publisher
<br />• Knowledgeable of design
<br />that protects and enhances
<br />natural features and habitats,
<br />incorporating them into the
<br />overall design, while respecting
<br />new urbanism design and
<br />development practices
<br />PROFESSIONAL CREDENTIALS
<br />• Bachelor of Landscape
<br />Architecture, Landscape
<br />Architecture, University of
<br />Florida, 2010
<br />• Professional Landscape
<br />Architect in Florida, #6667207,
<br />September 2, 2014
<br />• ISA Certified Arborist, FL-
<br />6527A, June 6, 2013
<br />• American Society of Landscape
<br />Architects (ASLA), Full Member
<br />• Member, International Society of
<br />Arboriculture (ISA)
<br />RELEVANT EXPERIENCE
<br />Districtwide On-Call Landscape Design Services, FDOT District Five (2017), FL
<br />Landscape architect/arborist. Under this contract, Kimley-Horn has managed the landscape
<br />architectural design on multiple Task Work Orders, including push-button contracts and major
<br />landscape design projects. One signature project is the landscape design at the interchange
<br />of I-95 and I-4 and the I-4/SR 92 interchange. This will provide a high visual impact landscape
<br />with a distinctive sense of place along the I-95 corridor while producing the lowest design,
<br />construction, and maintenance cost for the installed landscape elements. This project also
<br />included coordination and permitting with the FAA, Daytona International Airport, and Volusia
<br />County. Under this contract, Kimley-Horn provides ERC plan reviews for the Department, ensuring
<br />that plans submitted by others through the ERC system are compliant with current FDM criteria.
<br />Sarasota Bayfront Master Plan, Sarasota, FL — Landscape architect of record and
<br />consulting arborist. As a subconsultant to another firm, Kimley-Horn is providing professional
<br />consulting services for a long-term master plan that will establish cultural and economic legacy for
<br />the region while ensuring open, public access to the Bayfront. Specific services include landscape
<br />architecture, irrigation, and arboriculture services, utility design, and permitting services.
<br />Siesta Key Beach Park, Sarasota County, FL — Production designer that aided in the
<br />creation of multiple presentation graphics. Kimley-Horn worked with Sarasota County for the
<br />implementation of this $21-million project. Construction started in fall 2013 and opened February
<br />2016. Construction was carefully sequenced to minimize interruption during peak tourist
<br />season. Services included programming, park design, landscape architecture, civil engineering,
<br />construction documents, and permitting for this high-profile park project. Design components
<br />included “site design” enhancements; a beachfront esplanade to connect key park components;
<br />improved traffic circulation and parking; high-quality, indigenous architecture; beautification
<br />consistent with a “world class” beach park; phasing and effective implementation while keeping
<br />the park open; wayfinding signage; environmental permitting; sustainable design to respect the
<br />environment and wildlife; and LID/LEED design solutions.
<br />SR A1A Complete Streets Design, Hollywood, FL — Landscape architect of the Kimley-Horn
<br />team serving the City of Hollywood to help reduce the number of travel lanes and incorporate
<br />Complete Streets elements within the corridor between Hollywood Boulevard and Sheridan Street.
<br />The concept plans will include a reduction of speed, improving safety for vehicles, pedestrians, and
<br />bicyclists; wider sidewalks, buffered bicycle lanes, and designated loading zones; and improved
<br />street furniture, landscaping, and signage. The team will also provide traffic signal/roundabout
<br />analysis, driveway access review, emergency vehicle access review, meetings and coordination,
<br />and permitting services. Part of the project includes preparation of pilot plans/temporary
<br />implementation construction plans (to be permitted from FDOT) to allow the public to experience
<br />the lane reduction on a trial basis to test its effectiveness prior to making it permanent.
<br />Bayfront Park Recreation Center, Longboat Key, FL — Landscape architect. Kimley-Horn
<br />provided professional landscape architectural services for the design and implantation of a master
<br />plan to address the underutilization of the park and the accessibility and potential expansion
<br />of the existing community center. The design replaced the existing baseball field and outfield
<br />fences with a new open multipurpose field with a covered pavilion that overlooks the water and
<br />newly added pedestrian bridge. Several benches and covered picnic tables were added along the
<br />waterfront to take full advantage of the park’s unique location. Other park amenities include a
<br />kayak launch, playground, fishing pier, basketball court, tennis courts and large dog park.
<br />CHRIS CIANFAGLIONE, PLA, ASLA
<br />Horticulture
|