Laserfiche WebLink
Page 19Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br />3. Minimum Qualification Requirements b. Government Contracts <br />City of Tamarac Go-Forward Roadway Landscape Master <br />Plan Update <br />Tamarac, FL <br />City of Tamarac Commercial Boulevard Landscaping <br />Improvements <br />Tamarac, FL <br />Miller Legg provided the City of Tamarac with an update to its <br />citywide Roadway Landscape Master Plan. The project consisted <br />of creating a go-forward landscape roadmap guide that will <br />be implemented for years to come. Miller Legg conducted a <br />citywide tree inventory assessment, an evaluation of existing <br />landscape, irrigation and hardscape conditions, an overall <br />assessment of the existing character of the road corridors, and <br />an opportunities and constraints analysis. The overall goal was <br />to create a Landscape Master Plan that provides the City with <br />typical conceptual landscape concepts, recommendations, <br />guidelines, and implementation strategies to follow. The Master <br />Plan was unanimously adopted by the City Commission. <br />Start / Finish Date: 02/19 - 05/20 <br />The City of Tamarac engaged Miller Legg to provide landscape <br />architectural and survey services for the existing medians <br />along 1.70 miles of West Commercial Blvd in Broward County <br />between North Pine Island Road and Sawgrass Expressway. In <br />addition to landscape architecture, a certified arborist report <br />and survey (including vacuum excavations) services, the Miller <br />Legg team provided lighting and electrical services, irrigation <br />design, permitting, and construction administrative services. <br />Coordination efforts with multiple agencies, such as the <br />Florida Turnpike Authority (FTE) and the South Florida Water <br />Management District (SFWMD), is included in the project scope. <br />Specific services for these roadway improvements entailed <br />providing a specific purpose survey showing only above-ground <br />improvements, compiling a 30% conceptual landscape and <br />lighting plan, and providing 100% construction documents for <br />irrigation, landscape, hardscape, lighting and electrical, and an <br />arborist assessment. <br />Start / Finish Date: 12/20 - 06/22 (est)