Laserfiche WebLink
Page 444.2. Qualification of Key Personnel Assigned to Engagement <br />Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br /> <br /> <br />Years of Experience: 18 <br />Years With the Firm: 13 <br /> <br />Registrations & Certifications: <br />Registered Landscape Architect, FL, 2014 <br />Certified Arborist, FL, 2018 <br />FDOT Intermediate Maintenance of Traffic, FL, 2019 <br /> <br />Education: <br />Bachelor of Landscape Architecture, Minor in Environmental <br />Sciences <br />University of Florida, 2004 <br /> <br />Continuing Education: <br />FDOT LAP Training Certificate, 2018 <br />FDOT Specifications Package Preparation Training Certificate, <br />2017 <br />RainBird Landscape Irrigation Design Process Certificate, <br />2018 <br /> <br />Professional & Civic Activities: <br />Member, International Society of Arboriculture <br /> <br />Professional Experience: <br />Mr. Juncal is a Landscape Architect and <br />Certified Arborist focused on a variety <br />of public and private landscape <br />architecture projects including roadway <br />landscaping and irrigation, active and <br />passive park landscape design, higher <br />educational facilities as well as residential <br />and commercial projects. Certified <br />Arborist services include: tree species <br />identification and inventories, tree <br />surveys and canopy mapping, <br />destroyed/damaged tree assessments, <br />tree value estimates, tree grading, tree <br />species selection for planting, mangrove <br />trimming oversight and tree permitting. <br /> <br />Relevant Project Experience: <br /> <br />City of Sunny Isles Beach Pelican <br />Community Park - A three-acre active <br />park site, for which Miller Legg managed <br />landscape architecture, irrigation, <br />engineering, surveying and architecture <br />designs for a baseball field, recreation <br />building, playground structure, <br />gymnasium, and related site amenities <br />within the City of Sunny Isles Beach. <br />The project management team at Miller <br />Legg received recognition from the City <br />for their involvement in the design <br />completion of the park. In addition, <br />Miller Legg provided construction <br />observation services. In addition, we <br />also provided grant assistance to secure <br />a Florida Recreational Development <br />Assistant Program (FRDAP) grant for <br />$200,000. FRDAP is a competitive grant <br />program that provides financial <br />assistance to local governments for <br />development or acquisition of land for <br />public outdoor recreational purposes. <br />Award: Award of Merit, American Society of <br />Landscape Architects, Florida Chapter, 2009 <br /> <br />City of Sunny Isles Beach Gwen <br />Margolis Park and Pelican <br />Community Park Artificial Turf - <br />The project consisted of the <br />reconstruction of existing natural turf <br />fields at Pelican Community Park and <br />Senator Gwen Margolis Park in the City <br />of Sunny Isles Beach with artificial turf. <br />Miller Legg provided the preparation and <br />permitting of drainage plans to collect <br />under the new drain systems installed as <br />part of the project, as well as surveying <br />services. In addition, construction <br />observation was provided to verify <br />compliance with the plans and for the <br />certification of the project through <br />regulatory agencies. <br /> <br />City of South Miami Sunset Drive <br />Roadway and Beautification <br />Improvements - For this 1/4-mile <br />roadway and beautification project along <br />Sunset Drive/SW 72nd Street from US 1 <br />to SW 57th Avenue, Miller Legg is <br />providing landscape architecture, <br />arborist, irrigation and construction <br />observation services. The project scope <br />consists of roadway and beautification <br />improvements which includes proposed <br />type ‘F’ curb and gutters, the <br />replacement of sidewalks, and proposing <br />new trees and plants and specified <br />locations throughout the project site. <br />Specific services include tree removal <br />and disposition, irrigation field <br />investigation, hardscape design, landscape <br />design and construction observation <br />services. Miller Legg is a subconsultant <br />to Marlin Engineering. <br /> <br />City of Miami Museum Park <br />Baywalk Phase 3 - Miller Legg <br />provided landscape architecture, civil <br />engineering, lighting/electrical <br />engineering, surveying, permitting and <br />limited construction administration <br />services for the Miami Baywalk Phase 3 <br />Project. Permitting for project <br />improvements was provided through the <br />City of Miami, Miami-Dade County and <br />South Florida Water Management <br />District. Underground utility designation <br />for electric and drainage utilities was <br />performed.The project is a 1/4 mile <br />pedestrian-oriented urban waterfront <br />park and promenade on Biscayne Bay, <br />located adjacent to the east coast <br />greenway. It provides a unique open <br />space that links the American Airlines <br />Arena, Biscayne Boulevard, and Museum <br />Miguel Juncal, RLA, CA <br />Landscape Architect | Assistant Project Manager (50% Availability) <br />