|
Page 484.2. Qualification of Key Personnel Assigned to Engagement
<br />Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
<br />
<br />Years of Experience: 5
<br />Years With the Firm: 4
<br />
<br />Education:
<br />Master of Landscape Architecture
<br />Florida International University, 2018
<br />Bachelor of Arts, Urban Design
<br />Florida Atlantic University, 2014
<br />
<br />Continuing Education:
<br />Crime Prevention Through Environmental Design Practioner
<br />Seminar, 2013
<br />Green Building and Sustainable Development Course, 2013
<br />
<br />
<br />Professional Experience:
<br />Ms. Fuentes is a Landscape Designer and
<br />Recreational Planner supporting the
<br />firm's projects including those in the
<br />public sector such as the Florida
<br />Department of Transportation and South
<br />Florida municipalities. Her experience
<br />includes landscape design, parks master
<br />planning and hardscape design.
<br />
<br />Relevant Project Experience:
<br />
<br />City of Miami Armbrister Park
<br />Community Center - Esther Mae
<br />Armbrister Park is a 4.4-acre City of
<br />Miami Park located at 4000 Grand
<br />Avenue, Miami, FL 33133 in the Coconut
<br />Grove neighborhood. Park amenities
<br />include an existing community center,
<br />baseball and football fields, tennis and
<br />basketball courts, playground and
<br />exercise equipment. The project involves
<br />replacement of the existing community
<br />center building with a new 10,000 SF 2-
<br />story facility and outdoor pavilion. Miller
<br />Legg is responsible for civil, landscape
<br />architecture and SUE services along with
<br />boundary, topographic and tree
<br />surveying. The firm is providing site civil
<br />and utility infrastructure research of
<br />utility maps, as-builts and existing site
<br />conditions followed by preparation of
<br />civil, landscape architecture and
<br />irrigation construction documents,
<br />government agency permitting
<br />coordination, bidding assistance, contract
<br />administration and construction
<br />administration. Tree inventory,
<br />disposition plans and permitting are part
<br />of the scope provided by the firm's
<br />certified arborists.
<br />
<br />City of Miami E.G. Sewell Park -
<br />Miller Legg is under contract with the
<br />City of Miami for program development,
<br />pre-design, master planning design
<br />including public involvement workshops,
<br />construction documents and
<br />construction administration services for
<br />Sewell Park. The program will be an
<br />open passive park with elements
<br />including passive walkways through park
<br />and preserve areas, pavilions, an eco
<br />trail, baywalk, hardscape, floating docks,
<br />kayak launch, seawall/living shoreline,
<br />wayfinding and historical information
<br />signage. The scope of services includes
<br />landscape architecture, irrigation, civil
<br />engineering, topographical surveying,
<br />SUE, certified arborist, structural
<br />engineering, electrical engineering,
<br />geotechnical engineering, archeological,
<br />permitting, bidding assistance and limited
<br />construction administration. Miller Legg
<br />will also conduct a Bonneted Bat survey
<br />and perform a bathymetric survey for
<br />the seawall component. The firm is
<br />assisting the City to gather community
<br />stakeholder input during the design
<br />process. Government agency permitting
<br />will be coordinated with Miami-Dade
<br />Co. DERM, WASD and SFWMD.
<br />
<br />City of Miami Fairlawn Community
<br />Park - Under our continuing services
<br />contract with the City of Miami, Miller
<br />Legg was awarded the development of
<br />programming, pre-design/concept,
<br />design, construction document
<br />preparation and construction phase
<br />services for a new park on SW 63rd
<br />Avenue. The scope includes civil
<br />engineering, landscape architecture,
<br />certified arborist, surveying and SUE,
<br />structural, electrical and geotechnical
<br />engineering as well as permitting, opinion
<br />of probable cost and limited
<br />construction administration. The passive
<br />park will contain a shaded/fenced
<br />children's playground, dog run, shared
<br />pedestrian / bicyclist perimeter path,
<br />light bollards, benches, pedestrian pole
<br />lighting, irrigation, water fountain, bike
<br />racks, receptacles, hardscape furniture,
<br />access driveway and perimeter privacy
<br />walls. Permitting will be coordinated
<br />with the City of Miami, Miami-Dade
<br />County DERM, WASD and SFWMD.
<br />Survey services include boundary and
<br />topographic and tree inventory. Miller
<br />Legg will assist the City with the
<br />presentation of conceptual designs at
<br />Community Meetings to gather public
<br />input for a final design.
<br />
<br />Liudmila Fuentes, MLA
<br />Landscape Designer | Community Outreach (15% Availability)
<br />
|