Laserfiche WebLink
Page 834.2. Qualification of Key Personnel Assigned to Engagement <br />Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA <br /> <br />Years of Experience: 18 <br />Years With the Firm: 15 <br /> <br />Registrations & Certifications: <br />FDOT Intermediate Maintenance of Traffic, FL, 2021 <br />Underground Utility Locate Certification, FL, 2022 <br />Certified Survey Technician Level I, FL, 2021 <br /> <br />Education: <br />High School GED <br />Killian Senior High School, 2001 <br /> <br /> <br />Professional Experience: <br />Since joining Miller Legg, Mr. Edelman <br />worked his way up from Rod Person to <br />Party Chief. He has experience working <br />with both surveying and subsurface utility <br />engineering (SUE) projects for public <br />entities throughout South Florida. <br />Experience includes boundary, <br />topographic, right-of-way, as-built, <br />special purpose surveys, cross sections, <br />drainage surveys, construction surveys, <br />and a variety of other surveys. <br /> <br />Relevant Project Experience: <br /> <br />City of Sunny Isles Beach Gwen <br />Margolis Park and Pelican <br />Community Park Artificial Turf - <br />The project consisted of the <br />reconstruction of existing natural turf <br />fields at Pelican Community Park and <br />Senator Gwen Margolis Park in the City <br />of Sunny Isles Beach with artificial turf. <br />Miller Legg provided the preparation and <br />permitting of drainage plans to collect <br />under the new drain systems installed as <br />part of the project, as well as surveying <br />services. In addition, construction <br />observation was provided to verify <br />compliance with the plans and for the <br />certification of the project through <br />regulatory agencies. <br /> <br />City of Coral Springs Municipal <br />Complex Topographical Survey - In <br />preparation for the development of the <br />new City of Coral Springs Municipal <br />Complex, Miller Legg was retained to <br />prepare a topographic survey to <br />incorporate previously surveyed <br />portions of the property to show 50' <br />elevations as well as storm and sanitary <br />sewer inverts. <br /> <br />City of Miami Gardens Rolling Oaks <br />Regional Park - Renovations of Rolling <br />Oaks Regional Park include construction <br />of a new one-story 4,000 SF recreation <br />building, renovated restroom facilities, <br />expansion of walking trail with lighting, <br />distance marker, and exercise stations, <br />new pavilions, new parking lot, <br />refurbished basketball and tennis courts, <br />new fencing, new shaded playgrounds, <br />new landscaping and irrigation, addition <br />of horseshoe pits, sand volleyball, mini <br />golf and splashpad, and video system and <br />WIFI. Miller Legg is providing civil <br />engineering, landscape architecture and <br />surveying services for this 7-acre park as <br />a subconsultant to Synalovski, Romanik <br />and Saye Architects. The civil scope <br />includes design of a lift station and on- <br />site force main extension to service the <br />proposed Welcome Center. An arborist <br />assessment of existing trees and palms <br />was carried out as part of the landscape <br />architecture services. <br /> <br />City of Coral Gables Sunrise <br />Harbor Surveying - As part of the <br />team which conducted a drainage <br />infrastructure needs assessment within <br />the Sunrise Harbor neighborhood in <br />Coral Gables, Miller Legg was retained <br />to perform topographic surveying of <br />roadways within the subdivision to show <br />above-ground improvements including <br />evidence of utilities, sanitary and <br />drainage sewer structure rim elevations <br />and traffic signs. Invert elevations, pipe <br />sizes, directions and material were <br />shown in accessible storm and sanitary <br />sewer structures. A tree survey was <br />conducted to show trees in the right-of- <br />way as well as trunk diameters, <br />approximate heights and canopy spreads. <br />The scope also included topographic <br />surveys on specific lots and provided <br />bottom of canal elevations at outfalls and <br />outfall pipe invert elevations. Our crews <br />used our terrestrial field 3-D scanner to <br />complete this work in an expeditious <br />manner. <br /> <br />City of Coconut Creek Copans <br />Road Median Landscape <br />Architecture Plans - For this median <br />improvement project along Copans Road <br />between Lyons Road and the Florida <br />Turnpike Overpass, Miller Legg provided <br />landscape, hardscape and irrigation <br />design plans, tree inventory, surveying, <br />permitting, pre-construction and <br />construction observation services to the <br />Gerald Edelman, CST I <br />Survey Party Chief (As Needed)