My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(22-06-01) Landscape Architectural Services CCNA
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 10:49:45 AM
Creation date
6/30/2022 10:47:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client <br />City of Plantation <br />401 NW 70th Terrace <br />Plantation, FL 33317 <br />(;ontact Inion-natiorl at Tir�ne WPlojr3ci <br />Brett Bulter, PE, City Engineer <br />Tel: 954.797.2282 <br />t\ <br />t)j,0C is 1.}"l (e <br />2017-2021 <br />/ Surveying <br />Landscape Architecture <br />Arborist Services <br />Civil Engineering <br />{ Electrical Engineering <br />(III Construction Services <br />$ 654,725.00 <br />Li;U11 I a o $ 9,000,000.00 <br />PINE ISLAND PARK - RECONSTRUCTION <br />Plantation, FL <br />In 2017, Calvin, Giordano & Associates, Inc. (CGA) was awarded a contract by the City <br />of Plantation to provide planning, design, and construction services for a complete re- <br />construction of Pine Island Park as part of the City's Parks Bond program. The major goals <br />of the design of this park were to significantly improve the drainage and playability of the <br />soccer fields, to enhance the experience of park users by providing new walkways, shaded <br />seating areas, and a main entrance courtyard, and to improve ADA accessibility. Therefore, <br />the proposed improvements to this highly used 24 -acre soccer park, include the removal <br />of the old existing parking lot, expansion and renovation of the new City -owned parking lot, <br />two (2) new Parks & Recreation buildings, and re -grading of the site to accommodate six (6) <br />natural grass soccer fields, one (1) main synthetic turf soccer field, and one (1) synthetic <br />turf goalie practice area, as well as extensive sidewalk, lighting, and drainage improvements <br />throughout the site. Some additional unique design features of the park include brick columns <br />and an arched entryway into the park, an open-air pavilion for trophy presentations and special <br />events, and a new, electronic messaging board and monument sign along Pine Island Road. <br />CGA provided surveying, site planning, civil engineering, electrical engineering, landscape <br />design, and irrigation design services for the project, as well as permitting and construction <br />administration. The park improvements was completed in June 2022. <br />�� City of Sunny Isles Beach j RFQ #22-06-01 1 Continuing Services for Landscape Architectural Services CCNA 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.