My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3378
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 11:27:33 AM
Creation date
8/4/2022 4:09:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3378
Date (mm/dd/yyyy)
07/21/2022
Description
Approving C.O. #2 & 3 to the Agreement w/ The Stout Group, Inc. for construction of the Golden Shores Utility Undergrounding project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJNNY IS -4 <br />f 0 <br />u � z <br />tiF 9j* FLO?\ 10 <br />C,TY OF SUN P'o <br />CITY OF <br />SUNNY ISLES BEACH <br />CONTRACT <br />Change Order <br />Change Order Number: 3 DATE: June 15,2022 <br />PROJECT: <br />ITB NUMBER: 21-08-01 Utility Undergrounding <br />For <br />RESOLUTION NUMBER: 2021-3279 Golden Shores <br />ORIGINAL DOLLAR CONTRACT AMOUNT: <br />$5,858,477.87 <br />NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: <br />$ 938,150.30 <br />CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: <br />$6,796,628.17 <br />DOLLAR AMOUNT OF THIS CHANGE ORDER: <br />$ 152,735.63 <br />NEW DOLLAR CONTRACT AMOUNT: 1 <br />$6,949,363.80 <br />ORIGINAL CONTRACT COMPLETION DATE <br />July 19,2023 <br />TOTAL OF PREVIOUS CHANGE ORDER DAYS: <br />0 <br />AMOUNT OF DAYS PER THIS CHANGE ORDER: <br />0 <br />NEW CONTRACT COMPLETION DATE: <br />July 19,2023 <br />DESCRIPTION OF SCOPE OR WORK CHANGES: <br />Stout Group has the manpower and equipment to complete the installation of up to 15 streetlights and finalize <br />undergrounding work for the Collins Avenue Undergrounding and Streetlight project. This work includes, but is not limited <br />to, setting of streetlights on existing bases, installation of new concrete bases as may be required, electrical equipment <br />installation, utility conduit installation, supervising preparation of as built documentation. This amount includes a <br />contingency for unforeseen conditions. <br />NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an <br />extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the <br />contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the <br />matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit <br />and delay relating to the issues set forth in this document. <br />258 <br />The Stout Group <br />,lose Sanchez <br />CONTRACTOR <br />Edward A. Dion <br />CITY ATTORNEY: <br />Vg— <br />HPF Associates, Inc <br />PT Abbott <br />PROJECT MANAGER: <br />City of Sunny Isles Beach <br />`� /�'��'► <br />CITY MANAGER: <br />258 <br />
The URL can be used to link to this page
Your browser does not support the video tag.