My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3362
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:57:15 PM
Creation date
8/15/2022 11:26:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3362
Date (mm/dd/yyyy)
07/21/2022
Description
Awarding RFP No. 22-04-01, agreement w/ Unitec, Inc., for deployment of Citywide Fiber Optic Network.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />pay the City Fifty Dollars ($50.00) per additional set of Contract Documents which it <br />may require. <br />6.2 City's Right to Stop Work <br />6.2.1 If the Contractor persistently fails or refuses to perform the Work in accordance <br />with this Contract, the City shall have the right, but not an obligation, to order the Contractor <br />to stop the Work, or any described portion thereof, until the cause for stoppage has been <br />corrected, no longer exists, or the City orders that Work be resumed. In such event, the <br />Contractor shall immediately obey such order. A stop work directive provided under this <br />paragraph shall not entitle the Contractor to an extension of the completion date nor any <br />financial compensation resulting from expenses due to delays caused by this Stop Work <br />directive. <br />6.3 City's Right to Perform Work <br />6.3.1 If the Contractor's Work is stopped by the City under Paragraph 6.2, or if the <br />Contractor persistently fails or refuses to perform the Work in accordance with this Contract, <br />and the Contractor fails within three (3) days of such stoppage, failure, or refusal, to provide <br />adequate assurance to the City that the cause of such stoppage will be eliminated or <br />corrected, then the City may, without prejudice to any other rights or remedies the City <br />may have against the Contractor, proceed to carry out the subject Work. In such a situation, <br />an appropriate Change Order shall be issued deducting from the Contract Price the cost <br />of correcting the subject deficiencies, plus compensation for the City's Representative's <br />additional services and expenses necessitated thereby, if any. If the unpaid portion of the <br />Contract Price is insufficient to cover the amount due the City, the Contractor shall pay the <br />difference to the City. <br />6.4 Inspections <br />6.4.1 No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer/Architect or <br />any agent of the City, to condemn any defective work or material shall not release the <br />Contractor from its obligations to install the Work free from faults and defects and to <br />promptly remove and repair any defective or deficient work. The Contractor hereby <br />acknowledges and agrees that no inspector shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents; <br />Unitec Inc. 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.