My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3362
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 4:57:15 PM
Creation date
8/15/2022 11:26:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3362
Date (mm/dd/yyyy)
07/21/2022
Description
Awarding RFP No. 22-04-01, agreement w/ Unitec, Inc., for deployment of Citywide Fiber Optic Network.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />(e) Advise on or issue directions as to safety precautions and programs in connection <br />with the Work. Provided however, this shall not preclude the City inspector from <br />notifying the Contractor of any hazardous or dangerous condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Coordination and Scheduling of Work <br />6.5.1 The Contractor shall cooperate with the City and any separate contractors <br />retained by the City, and the Contractor shall carefully coordinate and schedule the Work <br />as may be required to accommodate without delay or interference the Work of the City or <br />any of its separate contractors. <br />6.6 Contractor Responsible for Delays <br />6.6.1 Contractor agrees that if Substantial Completion is not achieved by the <br />applicable Substantial Completion Date as defined in Paragraph 3.1.1, Contractor shall pay <br />to the City as liquidated damages One Hundred Dollars ($100.00) for each day beginning on <br />the first day after the Substantial Completion Date up to but not including the Substantial <br />Completion Date. <br />6.7 Contractor Field Office and Storage. <br />6.7.1 The City agrees to provide Contractor with a field administration office and two (2) <br />exterior storage areas for Contractor's use in connection with the Work at no cost to the <br />Contractor. The Contractor, however, shall remain solely responsible for protection and <br />safekeeping of equipment and materials at or near the sites, and no claim shall be made against <br />the City by reasons of any act of an employee or trespasser. The Contractor will retain a full set <br />of contract documents in the field administration office including this document and current as - <br />built plans available for the City's access at all times. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1 Upon providing no less than forty-eight (48) hours' notice to the Contractor, <br />the City may conduct a pre -construction conference at a time and place set forth in the <br />aforesaid notice. ATTENDANCE AT ALL PRE -CONSTRUCTION CONFERENCE(S) IS <br />MANDATORY AND FAILURE TO ATTEND SHALL BE A MATERIAL BREACH OF <br />THIS CONTRACT. <br />7.2 The Contractor shall perform no part of the Work, including ordering of material, <br />at any time without adequate Contract Documents or, as appropriate, approved Shop <br />Drawings, Product Data or Samples for such portion of the Work. If the Contractor performs <br />any of the Work knowing it involves a recognized error, inconsistency or omission in the <br />Contract Documents without such notice to the City's Representative, the Contractor shall <br />bear responsibility for such performance and shall bear the cost of correction. <br />Unitec Inc. 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.