My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3424
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2025 1:08:21 PM
Creation date
10/27/2022 4:25:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3424
Date (mm/dd/yyyy)
10/20/2022
Description
Short-listing firms to provide landscape architectural services (RFQ 22-06-01)
Supplemental fields
Comment
CGA Agreement was never executed, per Valerie, they did not agree to the terms & conditions of the City. Susan mentioned we did not need those svcs since we used them already for Civil Engineering CCNA on email dated: 1/31/2023.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pit <br />r; <br />l.; <br />r <br />l� <br />J <br />ril <br />L <br />ki <br />L <br />L <br />L <br />L <br />Q-9Calvin, Giordano & Associates, Inc. <br />A SAFEbuilf COMPANY <br />We have among our ranks valuable experience to ensure that a risk management approach is taken on from the onset to avert <br />conflicts, provide solutions, minimize change orders, and ensure that products conveyed to the community and the public are <br />implementable and can effectively be delivered. <br />Waterways <br />As with streets and roadways, multiple permitting jurisdictions could potentially be involved with any waterway improvement <br />project. Although the City is mostly built out, there could remain some environmental issues associated with canal improvement <br />projects. Permitting through the City and Miami -Dade DERM would be required, and if the waterway were deemed navigable, the <br />permitting could include the Army Corps of Engineers (ACOE). We understand what these Issues are and how to successfully <br />permit them through to completion. <br />Landscape at the Local Levels <br />As municipal consultants, where we not only propose landscape improvements but also draft codes, review landscape <br />plans for code compliance, and conduct landscape Inspections, we are well versed in understanding what are the non- <br />negotiable components of making plans work at a local level. Ensuring that the community is well -served with shaded walkable <br />environments; that we are minimizing water consumption; positively affecting stormwater treatment; and enhancing the overall <br />quality of fife of the residents are all of the values we can deliver while being cognoscente of local codes and their parameters. <br />City of Sunny isles Beach i RFQ #22-06-011 Continuing Services for Landscape Architectural Services CCN 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.