Description
Change Order #5 with The Stout Group, Inc, for construction of Golden Shores Utility Undergrounding Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJNNY ,S4 <br />ti n <br />P <br />yF/99>* FLO��� SSP <br />C'rY <br />OF SUVA <br />PNo <br />CITY OF <br />SUNNY ISLES BEACH <br />CONTRACT <br />Change Order <br />Change Order Number: 5 DATE: October 31,2022 <br />PROJECT: <br />ITB NUMBER: 21-08-01 Utility Undergrounding <br />For <br />RESOLUTION NUMBER: 2021-3279 Golden Shores <br />ORIGINAL DOLLAR CONTRACT AMOUNT: <br />$5,858,477.87 <br />NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: <br />$1,395,688.45 <br />CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: <br />$7,254,166.32 <br />DOLLAR AMOUNT OF THIS CHANGE ORDER: <br />$284,265.98 <br />NEW DOLLAR CONTRACT AMOUNT: <br />$7,538,432.30 <br />ORIGINAL CONTRACT COMPLETION DATE <br />July 19,2023 <br />TOTAL OF PREVIOUS CHANGE ORDER DAYS: <br />0 <br />AMOUNT OF DAYS PER THIS CHANGE ORDER: <br />0 <br />NEW CONTRACT COMPLETION DATE: <br />July 19,2023 <br />DESCRIPTION OF SCOPE OR WORK CHANGES: <br />Golden Shores storm drainage requires additional storm drainage improvements on North Bay Dr and 190th St. Existing <br />asphalt material exceeding 12' in thickness has been encountered throughout the project. Unforeseen WASA sanitary <br />sewers have been discovered during excavation requiring repair. Construction trailer cost was excluded from bid due to <br />another contractor providing, responsibility now shifts to Stout Group. <br />NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of <br />time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment <br />and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all <br />direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in <br />this document. <br />The Stout Group <br />Jose Sanchez <br />CONTRACTOR <br />Edward A. Dion <br />CITY ATTORNEY: <br />\y— <br />HPF Associates, Inc <br />PT Abbott <br />PROJECT MANAGER: <br />City of Sunny Isles Beach <br />45 <br />CITY MANAGER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.