My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3431
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 12:53:13 PM
Creation date
11/30/2022 11:01:02 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3431
Date (mm/dd/yyyy)
11/17/2022
Description
Change Order #5 with The Stout Group, Inc, for construction of Golden Shores Utility Undergrounding Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-p-cz-..,...,,,:troy.. t <br />TO: <br />VIA: <br />FROM: <br />DATE: <br />RE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />Honorable Mayor and City Commissioners <br />Stan Morris, City Manager <br />Paul Abbott, City Consultant <br />November 17, 2022 <br />Approval of Change Order No. 5 to the Agreement with The Stout Group fo <br />the Golden Shores Utility Undergrounding Project <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />Change Order No. 5 increases the overall contract amount by $284,265.98 due to unforeseen <br />conditions relating to the depth of existing asphalt paving that needed to be removed, additional costs <br />incurred for the project construction trailer and additional improvements to the storm sewer system <br />in the Golden Shores neighborhood. <br />The original contract documents anticipated the depth of the existing asphalt paving to be 4" in <br />thickness. Ongoing excavation activities have found the vast majority of the roadway to consist of a <br />minimum of 8" to a maximum of 14" of asphaltic concrete paving. The additional material removal <br />and disposal is being charged at the contractual unit price per cubic foot of volume. <br />The existing on site construction trailer was originally being provided and paid for by an alternate <br />contractor for the city while it was being shared by both contractors. The agreement with the <br />alternate contractor and the City has been terminated. The trailer is required for the ongoing <br />management of the Golden Shores undergounding project and will now be paid for solely by The Stoui <br />Group. <br />During the most recent storm event, significant flooding within the Golden Shores neighborhood was <br />encountered. The additional improvements contained in this Change Order will further improve the <br />Item Number: 10.6 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.