Laserfiche WebLink
November 2, 2022 / Page 5 of 15 <br />Bella Vista Park I Number 11723.04 <br />City of Sunny Isles Beach <br />Contract Addendum # 1 <br />SCHEDULE <br />MARINE ENGINEERING AND ENVIRONMENTAL CONSULTING SERVICES <br />(Cummins Cederberg — Structural and Environmental Sub.) <br />Task 602 New Seawall Design and Construction Documents (CD) <br />(Cummins Cederberg — Structural/Environmental Sub.) — <br />Task 603 New Seawall Environmental Permitting <br />(Cummins Cederberg — Structural/Environmental Sub.) — <br />Task 604 New Seawall Bid Assistance <br />(Cummins Cederberg — Structural/Environmental Sub.) — <br />Task 605 New Seawall Construction Administration <br />(Cummins Cederberg — Structural/Environmental Sub.) — <br />Task 703 Seawall Design Coordination (KEITH) <br />CIVIL ENGINEERING AND LANDSCAPE ARCHITECTURE <br />POST -DESIGN & CONSTRUCTION SERVICES <br />Task 801 Civil/Landscape Bidding Assistance — <br />Task 802 Civil Construction Observation and Certification Services — <br />Task 803 Landscape Construction Observation Services — <br />ELECTRICAL ENGINEERING (SGM — Electrical Sub.) <br />CONSTRUCTION MANAGEMENT SERVICES <br />Task 502 Electrical Construction Management Services <br />(SGM — Electrical Sub.) — <br />3 months <br />6 months <br />2 months <br />4 months <br />Concurrent with Task 602 <br />2 months <br />6 months <br />6 months <br />6 months <br />Engineering Inspired Design. <br />89 <br />