My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB #23-03-01 JOINT PROCUREMENT CENTRAL ISLAND DRAINAGE
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-03-01) SIB Central Isalnd Drainage Improvements & City of N Miami Beach Distribution System Watermain Replacements
>
ITB #23-03-01 JOINT PROCUREMENT CENTRAL ISLAND DRAINAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2023 3:46:03 PM
Creation date
3/27/2023 3:42:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach & City of North Miami Beach| Drainage Improvements & Watermain <br />Replacement 13 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.4 METHOD OF AWARD <br /> <br />The ITB shall be awarded to the lowest responsive and responsible Bidder, as more particularly set forth <br />below. The term “lowest responsible and responsive Bidder” as used herein shall mean the Bidder whose <br />bid is the lowest of those Bidders possessing the skill, ability, and integrity necessary for the faithful <br />performance of the work, whose bid best serves the interests of and represents the best value to each City, <br />as determined by their respective City Commission and/or the City Manager. The Bidder will also be <br />evaluated with respect to whether and to the extent they are “responsible” based upon their quality control <br />plan, safety plan and proposed project schedule. <br /> <br />SIB and NMB will each evaluate the bids with the intent of awarding a contract to the combined lowest <br />responsive and responsible Bidder for both of the Projects. Notwithstanding the foregoing, each City <br />reserves the right to forego awarding on a combined basis and may award the bid to the lowest responsible <br />and responsive Bidder whose bid best serves the interests of and represents the best value to each City. <br />Additionally, the Cities each reserve their right to reject any bid or part of a bid that does not conform to <br />the bidding requirements or to modify or waive all formalities and technicalities in a bid, or to reject all bids. <br /> <br />In the event that the Cities bid evaluation results in an award to the same Contractor, the following terms <br />shall control: <br /> <br />a. Each City will award a separate contract for its portion of the Projects to the selected Contractor <br />and shall be responsible for administering their own contract with respect to performing <br />inspections, approving pay applications, reviewing change orders, testing, permitting, as-built <br />review and certifications. However, both Cities will work together to ensure that there will be only <br />one mobilization for the Projects and that the Projects will be completed simultaneously. <br />b. The awarded Contractor will be required to furnish bonds and insurance to each individual City, <br />for their respective contracts. <br /> <br />In the event that the evaluation of the bids does not result in the Projects being awarded to the same <br />Contractor, the following terms shall control: <br /> <br />a. Each City shall proceed with their respective Project utilizing separate and distinct Contractors. <br />b. The Cities and the awarded Contractors agree to utilize best efforts in coordinating the work for <br />the Projects. <br />2.5 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO PROCEED <br /> <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written Notice to <br />Proceed (NTP) from the agency directing the Contractor to proceed with the work has been received by the <br />Contractor from the City Manager or designee; provided however, that such notification shall be <br />superseded by any emergency work that may be required in accordance with provisions included elsewhere <br />in this solicitation and resultant contract. In addition to the written NTP, the Contractor must supply the <br />City with the required insurance and bond documents. <br /> <br />The date of commencement of construction will be established during the Pre-Construction Conference, <br />which shall be held shortly after the award of contract and will be stated in the NTP. Immediately after the <br />NTP is issued and prior to actually commencing work, the Contractor agrees to deliver to the Engineer in a <br />form satisfactory to the Engineer, a Construction Progress Schedule. Showing dates of commencement and <br />completion for each and every subdivision of the project and a schedule of material delivery dates to be
The URL can be used to link to this page
Your browser does not support the video tag.