Laserfiche WebLink
<br />City of Sunny Isles Beach & City of North Miami Beach| Drainage Improvements & Watermain <br />Replacement 14 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />incorporated into each phase of work as set forth in the specifications. Within five working days of the <br />receipt of said schedule, the Engineer shall meet with the Contractor for a joint review. The Contractor shall <br />submit six copies of the corrected schedule at the Preconstruction Meeting for review and approval. All <br />work must be completed within the Contract Term herein specified. <br /> <br />2.6 CONTRACT TERM <br /> <br />The Substantial Completion of the Projects shall occur no later than three hundred sixty-five (365) calendar <br />days from date of issuance of all permits and notice to proceed, and Final Completion shall occur no later <br />than three hundred ninety-five (395) calendar days from date of issuance of all permits and notice(s) to <br />proceed. Time is of the essence. <br /> <br />For the purpose of this project, Final Completion shall be defined at that point after which the Director of <br />Public Utilities/City engineer or their representative, have made and approved the Final Inspection and the <br />Punch List has been completed, and all deliverables have been provided to the City. <br /> <br />2.7 LIQUIDATED DAMAGES <br /> <br />Failure to complete all the work within the time specified above, including any extension granted in writing <br />by the City, shall obligate the Contractor to pay the City, as liquidated damages and not as a penalty, an <br />amount equal to Three-Thousand Five Hundred Dollars ($3,500) for each calendar day of delay in the <br />completion of all the work. If any liquidated damages are unpaid by the Contractor, the City shall be entitled <br />to deduct these unpaid liquidated damages from the monies due the Contractor. <br /> <br />Liquidated damages are fixed and agreed upon between the Parties, recognizing the impossibility of <br />precisely ascertaining the amount of damages that will be sustained by the City as a consequence of such <br />delay and both parties desiring to obviate any question of dispute concerning the amount of damages and <br />the cost and effect of the failure of the Contractor to complete the Work on time. Liquidated damages shall <br />apply separately to each portion of the Work for which a time of completion is given. Delays caused by or <br />resulting from entities, Contractors or subcontractors who are not affiliated with the Contractor shall not <br />give rise to a claim by Contractor for damages for increase in material and/or labor costs. Such entities, <br />Contractors and subcontractors include, but are not limited to, the City's Contractors and subcontractors, <br />Florida Power and Light Company, AT&T, TECO Gas and Breezeline. <br /> <br />2.8 PRICE <br />If a Bidder is awarded a contract under this solicitation, the price shall remain fixed and firm during the <br />contract term. Contractor shall be responsible for mobilization and demobilization of labor, permits, <br />materials and equipment. Payment for mobilization and demobilization will be included in the lump sum <br />price indicated in the ITB. Pricing shall include such amounts, as Bidder deems proper, for all labor, <br />materials, supplies, equipment, subcontractors, insurance, bonds, overhead, profit and any other costs to <br />provide the work as noted in this ITB. <br /> <br />2.9 PERFORMANCE AND PAYMENT BOND <br /> <br />The City of Sunny Isles Beach shall require the successful Bidder to furnish a Performance Bond and Payment <br />Bond in the amount of 100% of the contract price, with the City of Sunny Isles Beach as the Obligee, as <br />security for the faithful performance of the Contract and for the payment of all persons performing labor <br />or furnishing materials in connection herewith within ten (10) calendar days after issuance of the Notice of <br />Award by the City. The Performance and Payment Bond shall continue in effect through the contract term.