Laserfiche WebLink
<br />City of Sunny Isles Beach & City of North Miami Beach| Drainage Improvements & Watermain <br />Replacement 17 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />Avenue, Suite 315, North Miami Beach, Florida 33162, as the certificate holder, must appear on <br />the certificate of insurance. <br /> <br />2.10.8 Equipment Floater insurance <br />For the value of any equipment being stored on site for the duration of the project. City of North <br />Miami Beach and City of Sunny Isles Beach must be shown as an additional insured with respect <br />to this coverage. The mailing address of City of North Miami Beach 17011 NE 19th Avenue, Suite <br />315, North Miami Beach, Florida 33162, as the certificate holder, must appear on the certificate of <br />insurance. <br /> 2.10.9 Umbrella or Excess Insurance <br />Umbrella or Excess Insurance with the following limits – Combined Single Limit of five million <br />dollars ($1,000,000) and is excess/additional to applicable coverages above. The City of North <br />Miami Beach must be shown as an additional insured with respect to this coverage. The mailing <br />address of the City of North Miami Beach is 17011 NE 19th Avenue Second Floor, Risk <br />Management, North Miami Beach, Florida 33162, as the certificate holder, and must appear on <br />the certificate of insurance. <br /> <br />NOTE: THE CITY OF SUNNY ISLES BEACH AND THE CITY OF NORTH MIAMI BEACH, AS APPLICABLE, <br />CONTRACT NUMBER AND TITLE MUST APPEAR ON EACH CERTIFICATE OF INSURANCE. THE CITY OF <br />SUNNY ISLES BEACH AND THE CITY OF NORTH MIAMI BEACH, MUST BE SHOWN AS AN ADDITIONAL <br />INSURED WITH RESPECT TO THIS COVERAGE. <br /> <br />2.11 INTERPRETATION OF PLANS AND DRAWINGS <br /> <br />On all drawings, the figured dimension shall govern in case of discrepancy between the scales and figures. <br />The Contractor shall take no advantage of any error or omission in the Drawings or of any discrepancy <br />between the Drawings and Specifications. The Engineer of Record shall make such interpretations as may <br />be deemed necessary for the fulfillment of the intent of the Drawings and Specifications as construed by <br />the Engineer, and his/her decision shall be final. If there is a discrepancy between plans and specifications, <br />the specifications govern. <br /> <br />2.12 MATERIALS, INSPECTION, AND RESPONSIBILITY <br /> <br />The City shall have a right to inspect any material to be used in carrying out this contract. The City does not <br />assume any responsibility for the availability of any controlled materials or other materials and equipment <br />required under this contract. The Bidder shall be responsible for the contract quality and standards of all <br />materials, components or completed work finished under this contract for 12 months from the date of final <br />approved inspection and acceptance. Materials, components, or completed work not complying therewith <br />may be rejected by the City and shall be replaced by the Bidder at no cost to the City. Any materials or <br />components rejected shall be removed within a reasonable time from the premises at the entire expense <br />of the Bidder, after written notice has been mailed by the City to the Bidder that such materials or <br />components for work have been rejected. <br /> <br />2.13 LABOR REGULATIONS <br /> The Contractor shall fully comply with all laws and regulations concerning labor, work hours, wage rates, <br />labor conditions and related matters. No Contractor or subcontractor contracting for any part of the