My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-01) East End of 172nd St Rdway & Drainage Improvements
>
Responses
>
The Stout Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 11:16:55 AM
Creation date
4/4/2023 11:12:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />THE STOUT GROUP, LLC. <br />Our commitment is to serve our clients we the highest level of standards and integrity including working safely on <br />time with quality and in budget. Using safety equipment is mandatory. We perform work the most organized way <br />possible to be able to save time. We like to finish work at the expected time specified in contracts. We make sure <br />every task is performed the most professional way to ensure that our finished product is of the highest quality. <br />Also, we like to work with the promised budget, that is why use our organizational skills to save money on <br />unneeded materials or doing work double. <br />Stout thanks you for the opportunity to present its experience, capacity, qualifications and commitment. <br />Sincerely, <br />The Stout Group, LLC <br />Joey Sanchez, PE <br />Manager <br />UNDERGROUND I SITEWORK I EARTHWORKS I PAVING <br />10850 NW 138th Street. Bay #3 - Hialeah Gardens, FL 33018 - 0: 788.452.1481 - F: 305.397.2311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.