Laserfiche WebLink
c� <br />SLEIMAN <br />\� CONSTRUCTION <br />Florida Certified General Contractor <br />CGC1529138 <br />o Experience: Over 45 Years of experience in plumbing, medical gas, and <br />underground utilities. Mr. Haber hold the licenses of certified general contractor, <br />certified plumbing contractor, certified underground utility contractor, certified <br />plumbing inspector, certified medical gas specialist. <br />• Mario Guidetti — Owner of MG Electrical Contractor <br />o Experience: over 20 years of experience in electrical work, especially in air <br />simulation companies such as Airbus Americas Training Center located in Miami. <br />Certified Electrical Contractor in the State of Florida. <br />• Manfred Delgado — President at Artistic Concrete Group. <br />o Experience: Specialized contractor with over 30 years of experience in the <br />construction of driveways, sidewalks, and other specialized concrete floors. <br />4. Approach / Methodology <br />Proposers approach methodology to providing the services requested in this solicitation. <br />The company organizes weekly meeting to assess the status of all projects currently ongoing to <br />assign responsibilities and resources where needed to complete important deadlines and <br />objectives. The company also coordinates with subcontractors to be aware of their activities and <br />manage with enough anticipation when the subcontractor has to perform an activity. <br />Everyone gets assigned a responsibility on the project, but other team members might assist if <br />necessary to complete the project efficiently. All documents are organized in specific folders, and <br />all issues are recorded in the issues log, which contains all the issues the project has and assigns <br />a responsible person or contractor, and a deadline to complete. This is the best way nothing falls <br />through the cracks. <br />Sleiman Construction has a crew ready for emergency responses within 2 hours. Upon receiving <br />the call and depending on the degree of the emergency, a crew will be assigned to the site to <br />address the issues. Our subcontractors are aware of emergencies since some of them also have <br />healthcare experience, which requires to be on call 24 hours. <br />Sleiman Construction will mobilize to the job once all the subcontract agreements are executed, <br />permits are pulled, and all the submittals have been approved so we have an estimated delivery <br />date for the materials or equipment; that way the restroom and surrounding areas are not <br />disturbed for too long while we wait for the materials and equipment. The work can get started <br />approximately 8 weeks after NTP upon approval of permits. <br />Manufacturers' warranty will be provided as part of the close out documents on equipment that <br />is installed on the site, as well as operations and maintenance manuals as required. <br />2801 NW 74th Ave, Suite 214, Miami, FL 33122 <br />(786)803-8575 <br />www.sleimanc.com <br />