My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sleiman Bid Submittal signed
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-02) Town Center Park Meditation Garden
>
Responses
>
Sleiman Bid Submittal signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 8:18:48 AM
Creation date
4/6/2023 12:57:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br />SLEIMAN <br />\� CONSTRUCTION <br />Florida Certified General Contractor <br />CGC1529138 <br />At Sleiman Construction, Quality assurance is achieved by following the QA/QC plan, in which <br />preparatory meetings are done before starting the work, during the execution of the work and <br />after the execution of the work. All materials are check at delivery time for compliance with <br />submittals and specifications requirements. <br />S. Corporate Standing and Authorized Signatory <br />See attached the following documents on the next pages. <br />a. Copy of firm's Articles of Incorporation listing the approved signatories of the corporation. <br />b. Copy of a resolution listing the members of staff as authorized signatories for the firm. <br />c. Letter from a corporate officer listing the members of staff that are authorized signatories for <br />the firm. Non applicable, there is no other member authorized to sign. <br />6. Litigation History <br />The company does not have any litigation or arbitration history since the company was created. <br />7. Forms and Attachments <br />See attached the following documents on the next pages: <br />Enclosed Forms; <br />Respondent must complete, sign as required, and submit the Addenda and all forms; and <br />Firm's Current Certificate(s) of Insurance. <br />8. Exceptions <br />1) Parking fees are not included, the City shall provide parking passes for our laborers and <br />subcontractors. <br />2) Working after hours, weekends, and holidays is not included. If the project is delayed by <br />us, or if any activity needs to be performed to coordinate better between subcontractors, <br />the contractor will determine if working after hours, weekends, or holidays is necessary, <br />upon coordination and approval from the City. <br />3) New Landscaping and sod outside of the area of work is excluded. <br />4) Camera inspection for sanitary lines is excluded. <br />5) MOT shop drawings and permits is excluded. <br />6) Bacteriological tests and backflow certifications are excluded. <br />7) Pool finish not indicated on drawings, subcontractor included only waterline and diamond <br />bright finish. <br />2801 NW 74th Ave, Suite 214, Miami, FL 33122 <br />(786)803-8575 <br />www.sleimanc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.