Laserfiche WebLink
purchases and credits to be made. If requested; furnish survey data to substantiate <br />quantities. <br />• Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />• Cost of labor and supervision directly attributable to the change. <br />• Comply with any applicable product requirements if the proposed change requires <br />substitution of one product or system for product or system specified. <br />9.3 ALLOWANCES <br />Allowance Adjustment. To adjust allowance amounts. Contractor shall base each Change Order <br />proposal on the difference between purchase amount and the allowance. multiplied by final <br />measurement of work -in- place. If applicable. Contractor shall also include reasonable allowances <br />for cutting losses, tolerances, normal product imperfections, and similar margins. Contractor also <br />agrees to the following conditions: <br />• Include installation costs in purchase amount only where indicates as part of the <br />allowance. <br />• If requested, prepare explanation and documentation to substantiate distribution of <br />overhead costs and other margins claimed. <br />• Submit substantiation of a change in scope of work, if any, claimed in change orders <br />related to unit -cost allowances. <br />• The City reserves the right to establish the quantity of work -in -place by independent <br />quantitv survev, measure. or count. <br />Contractor must submit claims for increased costs because of a change in scope or nature of the <br />allowance described in the Contract Documents. whether for the purchase order amount or <br />contractor's handling. labor. installation, overhead, and profit. Contractor shall submit claims <br />within fourteen (14) days of receipt of the change order or change directive authorizing work to <br />proceed. The City shall reject claims submitted later than fourteen (14) days after such <br />authorization. Contractor also agrees to the following conditions: <br />• Do not include Contractor's or subcontractor's indirect expense in the change order cost <br />unless it is clearly shown that the nature or extent of work has changed from what could <br />have been foreseen from information in the Contract Documents. <br />• No change to Contractor's indirect expense is permitted for selection of higher or lower <br />priced materials or systems of the same scope and nature as originally indicated. <br />9.4 CHANGE ORDER PROCEDURES <br />On the City's approval of a proposal request. the City Manager or his designee will issue a <br />change order for signatures of the City and the Contractor on a form approved by the City. <br />9.5 CONSTRUCTION CHANGE DIRECTIVE <br />Construction Change Directive. The City may issue a construction change directive on a form <br />approved by the City. Construction change directive instructs Contractor to proceed with a change <br />9 I !, <br />u <br />