My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2264
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:54:41 PM
Creation date
8/7/2014 9:19:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2264
Date (mm/dd/yyyy)
07/17/2014
Description
Agmt w/Safeware Inc. to Install/Maintain Phase I of Citywide Security CCTV Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project i\Ianager means an employee or representative of the City assigned to manage and monitor <br />the Services to be performed under this Agreement and the construction of the Project. <br />Project means the complete supply and installation. including incidentals thereto, to provide <br />a multiple zone security solution with an expandable high bandwith video surveillance system <br />for public safety and emergency preparedness and related services at ten (10) parks and various <br />locations throughout the City, as more fully described in the Contract Documents. <br />Request For Information (RFI) means a request from the Contractor seeking an interpretation <br />or clarification by the Citv relative to the Agreement and/or the Contract Documents. The RFI. <br />which shall be clearly marked RFI; shall clearly and concisely set forth the issue(s) or item(s) <br />requiring clarification or interpretation and why the response is needed. The RF1 must set forth the <br />Contractor's interpretation or understanding of the document(s) in question. along with the <br />reason for such understanding. <br />Specifications and Plans as used herein means that portion of the Contract Documents which <br />are the written requirements for the materials, equipment, systems, standards and workmanship for <br />completion of the Services and performance of related services for this Project. <br />Sub- Contractor(s) means a person or entity other than a materialman or laborer that has a <br />direct contract with the Contractor to perform or supply any portion of the Services in connection <br />with this Project. <br />Time for Completion means the time to complete all Services no later than Ninety (90) days <br />from the Commencement Date specified in the Notice to Proceed issued by the City Manager or <br />his designee. <br />Final Completion means the date certified by the City Manager or his designee that all <br />documents required by the Contract Documents have been received by the City Manager or <br />his designee: anv other documents required to be provided by Contractor have been received <br />by City Manager or his designee: and to the best of Citv Manager or their designee's <br />knowledge. information and belief the Services defined herein has been fully completed in <br />accordance with the terms and conditions of the Contract Documents. <br />Services as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br />ARTICLE 1. SCOPE OF WORK <br />Contractor shall provide all labor. materials, equipment, tools, manpower. management. <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided by this Agreement and the Contract Documents. <br />ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED <br />1 1' <br />3 1 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.