My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 23-04-01 Disaster Debris Management and Disposal Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-04-01) Disaster Debris Management and Disposal Services
>
ITB 23-04-01 Disaster Debris Management and Disposal Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 12:54:41 PM
Creation date
4/18/2023 12:51:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />20 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />copies of the load ticket and the vehicle operator will retain the remaining copies for DMC’s <br />records. DMC will scan all load tickets. DMC shall provide scanned copies of all load tickets, as well <br />as a spreadsheet itemizing all load tickets, once a week, or more frequently as requested by the <br />Contract Manager. Scanned load tickets shall be organized by activity date. DMC shall have a <br />system for clearly tracking and documenting all its costs associated with work conducted pursuant <br />to this contract, identifying expenditures eligible for reimbursement, and maintaining <br />documentation of the recovery process. <br /> <br />3.4.2 DMC shall supply certification placards meeting FEMA requirements and place such placards on its <br />vehicles. Placards shall also include the wording “City of Sunny Isles Beach Emergency Debris <br />Contractor” and the DMC’s name. <br />3.4.3 DMC will work closely with the City, with the City’s contracted Debris Monitor and applicable <br />Federal, State and local agencies to ensure that the City’s emergency recovery procedures and <br />data documentation for Eligible Debris meet the requirements of the reimbursement agencies. <br />DMC shall provide to the City all records, disposal tickets, field inspection reports and other data <br />necessary to adequately document recovery services and provide sufficient substantiation for <br />Federal and State reimbursement applications. DMC shall review all reimbursement applications <br />prepared by the City or Debris Monitor prior to submittal for sufficiency in meeting the <br />reimbursement requirements of these organizations and notify the City or Debris Monitor of any <br />recommended changes, corrections, alterations, or deletions. Such records shall be retained for a <br />period of three years following the date of the final payment to the contractor for all contract work <br />and shall be available at reasonable times and places for inspection by authorized representatives <br />of the contracting agency. <br /> <br />3.4.4 DMC shall reconcile any discrepancies between the Debris Monitor’s daily report and the <br /> corresponding load tickets within forty-eight (48) hours. <br />3.5 PAYMENT <br />The City, or its authorized representative, will monitor, verify and document with load tickets the <br />completion of all work, as defined in the scope of work. The Contractor(s) will be provided with copies of <br />this documentation. These documents will be used by the Contractor as backup data for invoice submittals, <br />upon services rendered. Work not ticketed or not authorized by the City will not be approved for payment. <br />Additionally, any ticket submitted for payment must be legible and properly completed. Tickets missing <br />loading address, truck number, certified capacity, collection monitor signature, disposal site, load call or <br />disposal monitor signature will not be paid, nor will the City be responsible for unpaid incomplete tickets. <br />The City will not pay and/or reimburse any additional costs including, but not limited to, travel, mileage, <br />lodging, meals, and other travel and subsistence expenses. Price submittals should be inclusive of all such <br />expenses. <br />Payment for disposal costs incurred by the Contractor at City approved Final Disposal Sites will be made at <br />the cost incurred by the Contractor. The City will either coordinate payment of disposal costs directly with <br />the Final Disposal Site or require the Contractor to pay the disposal fees and then invoice the City. The <br />Contractor(s) shall submit a copy of all invoice(s) received by the City approved Final Disposal Site, an <br />electronic copy tabulating all scale or load tickets issued by the City approved Final Disposal Site, and proof <br />of Contractor payment to the City approved Final Disposal Site. The City will not render payment for disposal <br />costs until the Contractor submits applicable disposal site permits or site information for each authorized <br />Final Disposal Site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.