Laserfiche WebLink
VEHICLE INSPECTION TOWER INFO <br />Inspection towers are provided as per contract guidelines. The cost of these towers is a part of our proposal and costs to be <br />absorbed by the company. Towers are built and provided at the various selected temporary debris sites/locations designated <br />by the Site -Specific Management Plan (SSSP). <br />Tower construction is as follows: <br />➢ The frame and body of the inspection tower is constructed with pressure treated wood. <br />➢ The floor is an 8"x 8" area, elevated 10 feet above a leveled ground area. <br />➢ All towers are constructed of 2"x 8" joists, 16" O.C. with 3/4 inch plywood supported by 6"x 6" posts. A <br />446ot-high wall constructed of 2"x 4" studs, and %Z inch plywood protects the perimeter of the floor area. <br />➢ The floor shall be covered with a solid roof. The roof will provide 7 feet of headroom below the support <br />beams. The tower will be adequately anchored and wooden steps with handrails will be constructed to <br />provide access. <br />➢ A worktable, 4' x 2 %2 x 3/4 inch plywood supported at all four corners will also be built. <br />➢ A temporary mechanical lift may be used until a fixed inspection tower is constructed. <br />IV k <br />40 <br />it rr <br />M <br />Page 47 of 87 <br />