My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
INVITATION TO BID 23-05-02 GOLDEN SHORES PUMP STATION REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 4:58:45 PM
Creation date
5/19/2023 4:57:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />21 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />SECTION 3 <br />SCOPE OF SERVICES / TECHNICAL SPECIFICATIONS <br /> <br /> <br />3.0 SCOPE OF SERVICE: <br />The City of Sunny Isles Beach (the "City"), a municipality located in Miami-Dade County, Florida, <br />is requesting bids from qualified Contractors (“Proposers”, “Bidders”, “Contractors”, or “Firms”) <br />to replace two (2) existing vertical storm pumps with two (2) new larger capacity vertical pumps, <br />to convert an existing generator room to house new pump controls, to install a new backup <br />generator, which will need to be powered by a new gas service line, on the north side of an existing <br />pumpstation building, to remove an existing bypass slide gate, to upgrade an existing building <br />façade, and reconstruct the adjoining parking area. The project location is 19200 North Bay Road <br />Sunny Isles Beach, FL 33160. <br /> <br />Ongoing station and generator maintenance will also be required. <br /> <br />3.1 AS-BUILT RECORDS: <br />A complete set of as-built records shall be kept by the Contractor at the job site. These records <br />shall show all items of construction and equipment which differ in size, shape or location from <br />those shown on the Contract drawings, also any additional work, existing features or utilities <br />revealed by construction work which are not shown on the Contract drawings. These records shall <br />be kept up to date daily. They may be kept on a marked set of Contract drawings to be furnished <br />the Contractor for this purpose, or in any other form which is approved prior to the beginning of <br />the work. They shall be available at all times during construction for reference by the City, and <br />shall be delivered to the City prior to pre-final inspection. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.