ARTICLE 4 - CONTRACT TIME <br />4.1 Time is of the Essence of this Contract. CONTRACTOR agrees to complete design <br />and submit for all associated approvals and permits within seventy five (75) calendar days of <br />conceptual design approval for the Project from the City Commission of the City of Sunny Isles <br />Beach. The Work shall be shall be in Substantial Completion no later than two hundred seventy <br />(270) calendar days from issuance of the Notice to Proceed by the City Manager or his designee. The <br />Contractor shall achieve Final Completion no later than thirty (30) days after the two hundred seventy <br />(270) day deadline to achieve Substantial Completion. The Notice to Proceed shall be issued for the <br />construction of the Project upon the submittal of an application for building permit for the Project or <br />the approval of 90% percent design by the CITY, whichever occurs first. The CONTRACTOR shall <br />commence on site construction of the Project the later of ninety (90) days after the City's issuance of <br />the Notice to Proceed for construction or issuance of all required permits. CONTRACTOR agrees <br />that all Work shall be prosecuted regularly, diligently and uninterrupted at such rate of progress as <br />will ensure full completion thereof within the time specified. Failure to achieve timely, substantial <br />and/or final completion shall be regarded as a breach of this Agreement and subject to the appropriate <br />remedies including but not limited to, liability for liquidated damages in accordance with Paragraph <br />12.3 herein. <br />ARTICLE 5 CONTRACT SUM - GUARANTEED MAXIMUM PRICE <br />5.1 Guaranteed Maximum Price. <br />5.1.1 CITY shall pay CONTRACTOR in current funds as full compensation for the <br />performance of all the Work for the design and construction of the Project which is subject to additions <br />and deductions by Change Order or Written Amendment as provided in this Agreement, and subject <br />further to possible reductions as set forth in Article 6.2.1 below, the sum of Two Million One Hundred <br />Thousand Dollars $2,100,000.00 (the "Guaranteed Maximum Price"). <br />5.1.2 The initial sum total of Two Hundred Fifty Thousand Four Hundred Dollars <br />($250,400.00) shall be attributed to the design phase which includes Pre - development expenses, <br />architectural and design fees, legal and administrative fees, Building Risk and General Liability <br />Insurance and Permit Fee Allowance, with the remaining amount attributed to the construction phase <br />as further detailed in the attached Exhibit titled Schedule of Values. Ownership in the signed and <br />sealed 100% "Issued for Construction" set of Plans and Specifications shall vest in the CITY once a <br />permit is issued to commence construction. <br />ARTICLE 6 CONTRACTOR'S RESPONSIBILITIES <br />6.1 Responsibilities - Construction Phase. <br />6.1.1 Consultation: CONTRACTOR will schedule and attend regular meetings and will <br />consult with CITY regarding site use and improvements, and the selection of materials, building <br />systems, and equipment. <br />6.1.2 Subcontractors and Suppliers: CONTRACTOR shall develop subcontractor interest <br />in the Project and shall furnish to the CITY, information, a list of subcontractors, including suppliers <br />