My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2277
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 12:14:54 PM
Creation date
8/11/2014 4:02:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2277
Date (mm/dd/yyyy)
07/31/2014
Description
Agmt. w/Ric-Man International, Inc. for the Design and Construction of a Pedestrian Bridge at Gateway Park, Awd RFP No. 13-08-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SD CDD' O OQ y4� <br />O! SVN 'N <br />TO: <br />VIA: <br />FROM <br />DATE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 City Hall <br />(305) 949 -3113 Fax <br />(305) 947 -2150 Building Department <br />(305) 947 -5107 Fax <br />Norman S. Edelcup, Mayor <br />Isaac Aelion, Vice Mayor <br />Jeanette Gatto, Commissioner <br />Jennifer Levin, Commissioner <br />George "Bud" Scholl, Commissioner <br />Christopher J. Russo, City Manager <br />Hans Ottinot, City Attorney <br />Jane A. Hines, MMC, City Clerk <br />MEMORANDUM <br />The Honorable Mayor and City Commission <br />Christopher J. Russo, City Manager <br />`—Bill Evans, Assistant City Manager <br />July 31, 2014 <br />RE: A Resolution Authorizing City Staff to Negotiate a Contract with Ric - <br />Man International, Inc. for the Design and Construction of a Pedestrian <br />Bridge at Gateway Park <br />RECOMMENDATIONS: <br />Staff recommends City Commission approve the Resolution. <br />REASONS: <br />To provide for safe pedestrian access to Gateway Park from the north side of Sunny Isles <br />Boulevard (SR826) the City desires to construct a bridge from the east side of North Bay <br />Road over Sunny Isles Boulevard to Gateway Park. There are five westbound lanes <br />separated by a solid concrete barrier between the south three lanes and the north two <br />lanes. Currently, access to Gateway Park from north of North Bay Road at Sunny Isles <br />Boulevard is via either Collins Avenue or the loop road under SR 826 at the Intracoastal; <br />each of these travel routes are approximately one -half mile in length and still require <br />crossing active roadways. <br />In order to advance this project quickly, the City issued RFP No. 13 -08 -01 to solicit <br />qualification proposals from interested firms or teams for a Design -Build contract. The <br />City received three responses to this RFP. Respondents were asked to submit additional <br />information that included both technical and cost proposals; the submittals were reviewed <br />and presentations conducted on July 10, 2014. Ric -Man International, Inc. (RMI) was <br />determined to be the most responsive, responsible proposer. Staff recommends approval <br />to enter into contract negotiations with RMI. <br />FUNDING SOURCE: C C <br />Aeenda Item J <br />Not to Exceed $2,100,000 from Account No. 20- 600.5688 I I <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.