My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2277
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 12:14:54 PM
Creation date
8/11/2014 4:02:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2277
Date (mm/dd/yyyy)
07/31/2014
Description
Agmt. w/Ric-Man International, Inc. for the Design and Construction of a Pedestrian Bridge at Gateway Park, Awd RFP No. 13-08-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yVgNY s6 <br />V L <br />i <br />M DESIGN -BUILD AGREEMENT <br />OF S " PEDESTRIAN BRIDGE <br />THIS AGREEMENT (this "Agreement "), made and entered into the <br />2014 by and between: <br />CLIENT: <br />CITY OF SUNNY ISLES BEACH, FLORIDA <br />a municipal corporation, and its assigns <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />(hereinafter to referred to as "CITY"), and <br />O C <br />DESIGN BUILDER: <br />RIC -MAN INTERNATIONAL, INC. <br />220 71` Street, Suite 206 <br />Miami Beach, FL 33141 <br />(hereinafter referred to as "CONTRACTOR ") <br />14 dday of <br />PROJECT: <br />Pedestrian Bridge (hereinafter referred to as the "PROJECT" and which shall be further defined in <br />this Agreement) <br />This Agreement may refer to the CLIENT or CONTRACTOR, individually, or as "Party" or as <br />"Parties." <br />WHEREAS, the CITY, has identified a certain parcel of real property located in the CITY <br />which the CITY owns and upon which it intends to have constructed site improvements consisting of <br />a Pedestrian Bridge and all incidentals thereto as further defined in this Agreement; <br />WHEREAS, the CITY wishes to retain the CONTRACTOR to perform all design, <br />construction and other services associated with and/or necessary to timely construct a code compliant <br />Project within the Guaranteed Maximum Price (hereinafter referred to as "Design - Build" services <br />which shall be further defined in this Agreement); <br />WHEREAS, the CONTRACTOR agrees to complete the Design -Build services within the <br />contract times and for a specified and fixed contract price as set forth in this Agreement as long as <br />any additions and revisions do not materially deviate from the information contained in City of Sunny <br />Isles Beach RFP No. 13 -08 -01 Gateway Park Pedestrian Access Improvements — Step 2 Technical <br />Proposal; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.