April 6, 2022 / Page 3 of 8 <br />11723.04 — Town Center Park Upgrades <br />City of Sunny Isles Beach <br />SURVEY SERVICES <br />Topographic Survey for the project site limits was previously completed by KEITH under a <br />separate work order. <br />SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES <br />Subsurface Utility Engineering (SUE) Services including horizontal designation, utility location, utility <br />mapping and franchise utility coordination are not included in this scope of work. If required, the <br />CONSULTANT will be pleased to provide additional services under a separate agreement. <br />CIVIL ENGINEERING SERVICES <br />Task 401 Preliminary Engineering / Design Development Plans <br />The Preliminary Plans are for CITY and/or City's Planning and Development Services <br />Department to review and approve the preliminary design. <br />KEITH will utilize a topographic survey previously prepared by KEITH and the site plan prepared <br />based on the Conceptual Master Plan provided by the CITY (prepared by O'Leary Richards Design <br />Associates) to prepare the preliminary / design development civil engineering plans. <br />The preliminary engineering plan shall include available existing utility information collected from <br />various sources (City, utility providers etc.). This preliminary utility information will be relied upon <br />by KEITH in the preliminary design phase. Final design may require additional survey and/or <br />Subsurface Utility investigation to verify the preliminary information supplied. <br />Preliminary water, sanitary sewer and drainage calculations shall be performed to address the <br />impacts of the proposed development relating to the requirements of the site plan submission. One <br />preliminary engineering plan will be prepared based on the supplied conceptual site plan provided <br />by the CITY. <br />KEITH shall attend one (1) coordination meeting with the CITY and City's Planning and <br />Development Services Department to review the preliminary design, code and integration of the <br />design with existing conditions (including utilities/trees/etc.) and environmental impacts of the <br />project. KEITH will coordinate with the CITY and other team members in the preparation of plans <br />to avoid conflicts between disciplines. <br />KEITH shall coordinate, prepare for and attend meetings with Government Agencies, including <br />project orientation meetings for base -line design agreements, review with City Planning, Zoning, <br />Fire Marshall, Engineering, and Utility representatives, and coordinate with applicable State, and <br />County Agencies required for final permit submittals. <br />Deliverables <br />1. Preliminary Engineering / Design Development Plans. <br />2. Preliminary Water, Sanitary Sewer and Drainage Calculations as required. <br />3. Meetings and Team Coordination — During the specified duration in the project <br />schedule, the KEITH team will attend up to three (3) required meetings and <br />coordination. It is assumed all meetings will be in South Florida. <br />Task 402 Engineering Construction Documents (CD) <br />On-site Paving, Grading, and Drainage Plans <br />KEITH shall prepare on-site paving, grading, and drainage construction plans, to support the <br />proposed development, that meet the requirements of the jurisdictional regulatory agencies. <br />Calculations shall be performed to address the impacts of the proposed development relating to the <br />Engineering Inspired Design. <br />0 <br />