Laserfiche WebLink
April 6, 2022 / Page 2 of 8 <br />11723.04 — Town Center Park Upgrades <br />City of Sunny Isles Beach <br />Per the CLIENT, the following deliverable/phases are to be included in the proposal: <br />• Design Development Plans (including Civil and Landscape). <br />• Initial Construction Documents (60% CDs) <br />• Final Construction Documents (100% CDs) <br />SCOPE OF SERVICES <br />Project Areas — Site Map <br />Concent Master Plan <br />Engineering Inspired Design. <br />1 <br />