My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />6.1.4 The City shall furnish the Contractor, free of charge, two (2) copies of <br />the Contract Documents for execution of the Work. The Contractor will be charged and shall <br />pay the City FIFTY Dollars ($50.00) per additional set of Contract Documents which <br />it may require. <br />6.2 City's Right to Stop Work <br />6.2.1 If the Contractor persistently fails or refuses to perform the Work in accordance <br />with this Contract, the City shall have the right, but not an obligation, to order the Contractor <br />to stop the Work, or any described portion thereof, until the cause for stoppage has been <br />corrected, no longer exists, or the City orders that Work be resumed. In such event, the <br />Contractor shall immediately obey such order. A stop work directive provided under this <br />paragraph shall not entitle the Contractor to an extension of the completion date nor any <br />financial compensation resulting from expenses due to delays caused by this Stop Work <br />directive provided said Stop Work directive is due to Contractor's actions or inaction. <br />6.3 City's Right to Perform Work <br />6.3.1 If the Contractor's Work is stopped by the City under Paragraph 6.2, or if <br />the Contractor persistently fails or refuses to perform the Work in accordance with this <br />Contract, and the Contractor fails within three (3) days of such stoppage, failure, or refusal, <br />to provide adequate assurance to the City that the cause of such stoppage will be eliminated <br />or corrected, then the City may, without prejudice to any other rights or remedies the City <br />may have against the Contractor, proceed to carry out the subject Work. In such a situation, <br />an appropriate Change Order shall be issued deducting from the Contract Price the cost <br />of correcting the subject deficiencies, plus compensation for the City's Representative's <br />additional services, if any, and expenses necessitated thereby, if any. If the unpaid portion of <br />the Contract Price is insufficient to cover the amount due the City, the Contractor shall pay <br />the difference to the City. <br />6.4 Inspections <br />6.4.1 No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer/Architect or <br />any agent of the City, to condemn any defective work or material shall not release the <br />Contractor from its obligations to install the Work free from faults and defects and to <br />promptly remove and repair any defective or deficient work. The Contractor hereby <br />acknowledges and agrees that no inspector shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.