My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in connection <br />with the Work. Provided however, this shall not preclude the City inspector from notifying <br />the Contractor of any hazardous or dangerous condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Coordination and Scheduliniz of Work <br />6.5.1 The Contractor shall cooperate with the City and any separate contractors <br />retained by the City, and the Contractor shall carefully coordinate and schedule the Work as <br />may be required to accommodate without delay or interference the Work of the City or any of <br />its separate contractors. <br />6.6 Contractor Responsible for Delays <br />6.6.1 The Contractor shall be responsible for any damages caused to the City as a <br />result of any delays caused by the Contractor. <br />6.7 Contractor Storage <br />6.7.1 The Contractor shall remain solely responsible for protection and safekeeping of <br />equipment and materials at or near the sites, and no claim shall be made against the City by <br />reasons of any act of an employee or trespasser. The Contractor will retain a full set of contract <br />documents in the field administration office including this document and current as -built plans <br />available for the City's access at all times. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1 Upon providing no less than forty-eight (48) hours' notice to the Contractor, <br />the City may conduct a pre -construction conference at a time and place set forth in the <br />aforesaid notice. ATTENDANCE AT ALL PRE -CONSTRUCTION CONFERENCE(S) IS <br />MANDATORY AND FAILURE TO ATTEND SHALL BE A MATERIAL BREACH OF <br />THIS CONTRACT. <br />7.2 The Contractor shall perform no part of the Work, including, ordering of material, <br />at any time without adequate Contract Documents or, as appropriate, approved Shop <br />Drawings, Product Data or Samples for such portion of the Work. If the Contractor performs <br />any of the Work knowing it involves a recognized error, inconsistency, or omission in the <br />Contract Documents without such notice to the City's Representative, the Contractor shall <br />bear responsibility for such performance and shall bear the cost of correction. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.