My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />7.16 Miscellaneous <br />7.16.1 Two (2) weeks prior to the Pre -Construction Meeting the Contractor shall submit <br />to the City Maintenance of Traffic Plans. Approval by the City of this plan is a condition <br />precedent to payment of any sums to the Contractor. The Contractor furthermore agrees to <br />cooperate with the City and all other appropriate governmental entities with respect to the <br />control, regulation, scheduling, and management of construction traffic. Contractor shall be <br />solely responsible for furnishing all labor, material, and equipment, and performing all <br />operations in connection with traffic control, including but not limited to providing signage, <br />directional assistance (flaggers), police details, or any other labor and equipment necessary to <br />ensure the proper maintenance of traffic in accordance with the Project Specifications and all <br />applicable codes, regulations, and laws. <br />7.16.2 Contractor shall ensure that the Work does not impede individual or vehicular <br />access to private property throughout the duration of the Work. Contractor may propose <br />temporary facilities to ensure access to private property provided the same is approved by <br />the City. <br />7.16.3 Contractor shall not enter upon, access, or disrupt private property. To the extent <br />that the Work may require Contractor to enter upon or access private property, the Contractor <br />shall immediately notify the City and shall not enter upon said private property unless <br />provided express permission by the City. The City shall not provide the Contractor access <br />to private property without first obtaining the private property owner's consent. <br />7.16.4 The City will provide the Contractor with Work Activity Notices (Door <br />Hangers), which Contractor shall post on affected private properties no less than two (2) <br />days in advance of planned Work affecting said properties. <br />7.16.5 Days and Hours of Work. With the exception of designated holidays or work <br />exclusion dates as determined by the City during which no construction shall be performed, the <br />construction portions of the Work shall only be performed on the following days and times: <br />Monday through Thursday, between 7:00 a.m. and Sunset; <br />Friday, 7:00 am to 5:00pm; and <br />Saturday, 9:00am to 5:00pm, with prior notice to and approval from the City. <br />The only exception to the day and time limitations set forth in 7.16.5 herein will be in the <br />event of a life safety occurrence requiring immediate corrective action. <br />7.16.6 The Contractor shall be responsible for, and shall pay the cost of, all temporary <br />facilities used, or made available, during the course of the Work. These facilities include, <br />but shall not be limited to, electric power, gas, water, sewage, and sanitation, waste removal <br />and disposal, telephone, and temporary office supplies and equipment. The Contractor shall <br />timely pay for all such temporary facilities and shall coordinate the installation and removal <br />of such facilities including, but not limited to, any required coordination with any utility <br />company. Furthermore, the Contractor shall be responsible for, and shall pay the cost of, <br />any utility work which may be necessary in order to perform the Work required by the <br />Contract Documents; this responsibility includes, but is not limited to, the cost of installing, <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.