My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />but not limited to, costs of acceleration or inefficiency, arising because of delay, <br />disruption, interference, or hindrance from any cause whatsoever, whether such delay, <br />disruption, interference, or hindrance be reasonable or unreasonable, foreseeable, or <br />unforeseeable, or avoidable or unavoidable. <br />It is further agreed that such direct costs do include the Contractor's home office <br />overhead, loss of efficiency, consequential damages, or equipment costs in excess of <br />actual equipment rental paid by the Contractor to a third party. The Contractor's sole and <br />exclusive remedy for delay, hindrance, and disruption shall be an extension of the <br />Contract Time provided a claim for same is made and is allowable pursuant to the <br />provisions of Paragraph 8.3.5 hereinabove. <br />8.4 Field Orders <br />8.4.1 The City's Representative after first obtaining approval from the City, shall <br />have authority to order minor changes in the Work not involving, a change in the Contract <br />Price or in - Contract Time and not inconsistent with the intent of the Contract. Such changes <br />shall be affected by Field Order and shall be binding upon the Contractor. The Contractor <br />shall carry out such Field Orders promptly. <br />ARTICLE IX <br />SUBCONTRACTORS <br />9.1 Definition <br />9.1.1 A Subcontractor is an entity that has a direct contract with the Contractor <br />to perform a portion of the Work. <br />9.2 Award of Subcontracts <br />9.2.1 Upon execution of the Contract, or as may be required by the Instructions <br />to Bidders, the Contractor shall furnish the City, in writing, the names of persons or <br />entities proposed by the Contractor to act as a Subcontractor on the Project. The City shall <br />promptly reply to the Contractor, in writing, stating any objections the City may have to <br />such proposed Subcontractor. The Contractor shall not enter into a Subcontract with a <br />proposed Subcontractor with reference to whom the City has made timely objection. The <br />Contractor shall not be required to Subcontract with any party to whom the Contractor has <br />objection. <br />9.2.2 All subcontracts shall afford the Contractor rights against the Subcontractor <br />which correspond to those rights afforded to the City against the Contractor herein, including <br />those rights afforded to the City by Subparagraph 12.2.1 below. <br />ARTICLE X <br />CHANGES IN THE WORK <br />10.1 Chanizes Permitted <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.