My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Certified General Contractor <br />SLEIMAN CGC1529138 <br />C(JNSTRlJCTlllN <br />o Experience: Over 45 Years of experience in plumbing, medical gas, and <br />underground utilities. Mr. Haber hold the licenses of certified general contractor, <br />certified plumbing contractor, certified underground utility contractor, certified <br />plumbing inspector, certified medical gas spedalist. <br />• Mario Guidetti — Owner of MG Electrical Contractor <br />o Experience: over 20 years of experience in electrical work, especially in air <br />simulation companies such as Airbus Americas Training Center located in Miami. <br />Certified Electrical Contractor in the State of Florida. <br />• Manfred Delgado — President at Artistic Concrete Group. <br />o Experience: Specialized contractor with over 30 years of experience in the <br />construction of driveways, sidewalks, and other specialized concrete floors. <br />4. Approach / Methodology <br />Proposers approach methodology to providing the services requested in this solicitation. <br />The company organizes weekly meeting to assess the status of all projects currently ongoing to <br />assign responsibilities and resources where needed to complete important deadlines and <br />objectives. The company also coordinates with subcontractors to be aware of their activities and <br />manage with enough anticipation when the subcontractor has to perform an activity. <br />Everyone gets assigned a responsibility on the project, but other team members might assist if <br />necessary to complete the project efficiently. All documents are organized in specific folders, and <br />all issues are recorded in the issues log, which contains all the issues the project has and assigns <br />a responsible person or contractor, and a deadline to complete. This is the best way nothing falls <br />through the cracks. <br />Sleiman Construction has a crew ready for emergency responses within 2 hours. Upon receiving <br />the call and depending on the degree of the emergency, a crew will be assigned to the site to <br />address the issues. Our subcontractors are aware of emergencies since some of them also have <br />healthcare experience, which requires to be on call 24 hours. <br />Sleiman Construction will mobilize to the job once all the subcontract agreements are executed, <br />permits are pulled, and all the submittals have been approved so we have an estimated delivery <br />date for the materials or equipment; that way the restroom and surrounding areas are not <br />disturbed for too long while we wait for the materials and equipment. The work can get started <br />approximately 8 weeks after NTP upon approval of permits. <br />Manufacturers' warranty will be provided as part of the close out documents on equipment that <br />is installed on the site, as well as operations and maintenance manuals as required. <br />2801 Nw 74th Ave, Suite 214, Miami, FL 33122 <br />(786)803-8575 <br />LV L'aVd.;�I�frtlr3llr_ C,(/Iri <br />
The URL can be used to link to this page
Your browser does not support the video tag.