My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Certified General Contractor <br />SLEIM nCGC1529138 <br />\ CON-SJR Ui_;Till P-1 <br />At Sleiman Construction, Quality assurance is achieved by following the QA/QC plan, in which <br />preparatory meetings are done before starting the work, during the execution of the work and <br />after the execution of the work. All materials are check at delivery time for compliance with <br />submittals and specifications requirements. <br />S. Corporate Standing and Authorized Signatory <br />See attached the following documents on the next pages. <br />a. Copy of firm's Articles of Incorporation listing the approved signatories of the corporation. <br />b. Copy of a resolution listing the members of staff as authorized signatories for the firm. <br />c. Letter from a corporate officer listing the members of staff that are authorized signatories for <br />the firm. Non applicable, there is no other member authorized to sign. <br />6. Litigation History <br />The company does not have any litigation or arbitration history since the company was created. <br />7. Forms and Attachments <br />See attached the following documents on the next pages: <br />Enclosed Forms; <br />Respondent must complete, sign as required, and submit the Addenda and all forms; and <br />Firm's Current Certificate(s) of Insurance. <br />S. Exceptions <br />1) Parking fees are not included, the City shall provide parking passes for our laborers and <br />subcontractors. <br />2) Working after hours, weekends, and holidays is not included. If the project is delayed by <br />us, or if any activity needs to be performed to coordinate better between subcontractors, <br />the contractor will determine if working after hours, weekends, or holidays is necessary, <br />upon coordination and approval from the City. <br />3) New Landscaping and sod outside of the area of work is excluded. <br />4) Camera inspection for sanitary lines is excluded. <br />5) MOT shop drawings and permits is excluded. <br />6) Bacteriological tests and backflow certifications are excluded. <br />7) Pool finish not indicated on drawings, subcontractor included only waterline and diamond <br />bright finish. <br />2801 NW 74th Ave, Suite 214, Miami, FL 33122 <br />(786)803-8575 <br />SYl'1VJ.Si�'itT1i�I1C,CUfi1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.